My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-20-04
10.0.0.9
>
City Council
>
CC Packets
>
2000's
>
2004
>
01-20-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2009 8:25:32 AM
Creation date
1/22/2004 3:31:49 PM
Metadata
Fields
Template:
City Council
City Council - Type
CC Packets
Date
1/22/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE: <br />TO: <br />FROM: <br />SUBJECT: <br /> <br />ill <br /> <br />MINNESOTA HISTO1HCAL $O(]IETY <br /> <br />HISTORIC SITES DIVISION <br />MEMORANDUM <br /> <br />December 8, 2004 <br />Hastings City Council Members <br />Natascha Wiener, Project Manager <br />LeDuc House Restoration Update <br /> <br />Per your request, the following is the first of the continuing monthly updates on construction work at the <br />LeDuc House Restoration. If you have any questions or concerns, please let me know and I would be <br />happy to discuss them with you. <br /> <br />· Work is proceeding at the Summer Kitchen. More structural repair was needed to the wood <br /> framing than expected, but the contractor has completed this work successfully. <br /> <br />The historic foundations at the Summer Kitchen, were discovered to be shallower than expected (as <br />little as 12" below grade). Due to concerns of heaving and in the interest of long-term <br />maintenance, we will be rebuilding the foundations. The new concrete foundation will be build to <br />frost depth, but at exposed areas above grade, we will use salvaged stone from the historic <br />foundation. <br /> <br />· The fire suppression system is currently being installed. The basement and third floors will be <br /> completed by end of week <br /> <br />· Air conditioning ducts are in the beginning stages of installation. <br /> <br />The search for replacement radiators, for those broken and un-repairable, has been extensive. We <br />were able to find very close matches to the historic radiators. I expect the search to be complete by <br />weeks end. <br /> <br />· The wallpaper has been removed and the walls were found to be in relatively good condition. We <br /> are currently discussing specifics of the plaster repair. <br /> <br />· Electrical work continues - much of the new conduit has been run. <br /> <br />· New underground phone lines have been brought to the house. <br /> <br />Cc: John Grossman, Tom Ellig, Bill. Keyes, Bob Frame, Mark Reidell, Tom PfannenstieI, file <br /> <br />1/8/2004 Page 1 of 1 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.