Laserfiche WebLink
<br />TKDA <br /> <br />ESTIMATE OF PROBABLE CONSTRUCTION COSTS <br /> <br />Project: Hastings City Hall 1st Floor Reception <br /> <br />Comm. No.: <br />By: TIF I Rev by daj <br />Date: 9/26/2007rev <br /> <br /> <br />HVAC <br />Fire Protection <br /> <br />$3,000.00 <br />$6,000.00 <br /> <br />$3,000 <br />$6,000 <br />$0 <br />$10,000 <br /> <br />SUBTOTAL MECHANICAL <br /> <br /> <br />~'~,:~~'~~~'~~~~~~f~!. <br /> <br />Demolition <br />Exterior Lights (on exisxting piers) <br />lighting Lobby/Reception <br />Power Lobby/Reception <br />Misc. Electrical <br /> <br />1 LS $3,500.00 $3,500 <br />6 EA $800.00 $4,800 <br />1 LS $8,000.00 $8,000 <br />1 LS $4,000.00 $4,000 <br />1 LS $2,500.00 $2,500 <br /> $22,800 <br /> $164,782 <br /> $24,717 <br /> $189,499 <br /> CALL IT $190,000 <br /> <br />SUBTOTAL ELECTRICAL <br /> <br /> <br />Page 3 <br />