Laserfiche WebLink
<br />MEMO <br /> <br />To: <br />From: <br />Date: <br />Re: <br /> <br />Honorable Mayor and City Council <br />Tom Montgomery <br />August 29, 2007 <br />Accept Quote - Downtown Quiet Zone 2nd St. Watermain Crossing Stub <br /> <br />Council is requested to accept the low quote of $3 8,856.65 from Otto Excavating <br />for installing a 2nd Street trunk water main crossing stub in advance of the Quiet Zone <br />median improvements. This watermain stub will ultimately be connected to the new <br />trunk watermain planned for the Downtown area and will be funded through the Water <br />Fund. Below is a listing ofthe three quotes received: <br /> <br />CONTRACTOR <br />Otto Excavating <br />Gartzke Construction <br />Nova-Frost,Inc <br /> <br />QUOTE <br />$38,856.65 <br />$42,381.00 <br />$43,465.00 <br /> <br /> <br />- <br />CITY Of HASTINGS <br />