Laserfiche WebLink
<br /> <br />Pay Request #8 Dated June 9, 2003 <br /> <br />02-2 18th st reconstrution Item Unit Unit Price Partial Estimate Total <br />SAP 130-127-05 Quantity <br />May,2003 Pay Request <br /> Clearing Tree 3000.00 0.00 $0.00 <br /> Grubbing Tree 2750.00 0.00 $0.00 <br /> Remove Sewer Pipe LF 8.00 0.00 $0.00 <br /> Remove Concrete curb and gutter LF 3.00 0.00 $0.00 <br /> Remove Bit Curb LF 1.00 0.00 $0.00 <br /> Remove Concrete sidewalk SY 10.00 0.00 $0.00 <br /> Remove concrete drwy pavement sy 1.50 0.00 $0.00 <br /> Remove bit pavement sy 1.50 0.00 $0.00 <br /> Remove catch basin Imanhole Each 300.00 0.00 $0.00 <br /> Common excavation cy 6.00 0.00 $O.O() <br /> Subgrade excavation cy 5.00 0.00 $0.00 <br /> Granular borrow-Iv cy 5.80 0.00 $0.00 <br /> Topsoil borrow-Iv cy 8.00 0.00 $0.00 <br /> Salvaged Aaa from stockpile-millinas- cy 4.50 0.00 $0.00 <br /> Salvaged topsoil from stockpile cy 2.00 0.00 $0.00 <br /> Salvaged topsoil -ev cy 4.50 0.00 $0.00 <br /> Agg Base CI-5 ton 6.95 0.00 $0.00 <br /> Mill Bit Surface SY 1.50 0.00 $0.00 <br /> Type mv4 mix-wear course ton 30.00 0.00 $0.00 <br /> Type mv3 non-wear course mix ton 26.50 0.00 $0.00 <br /> Irregular width paving sy 10.30 0.00 $0.00 <br /> Bituminous material for tack coat gal 1.75 0.00 $0.00 <br /> Connect to exist storm Each 325.00 0.00 $0.00 <br /> Adjust gate valve box Each 75.00 0.00 $0.00 <br /> Adjust curb box Each 110.00 0.00 $0.00 <br /> l' gate valve box sect. Over curb box Each 76.00 0.00 $0.00 <br /> Adjust frame & rino casting Each 225.00 0.00 $0.00 <br /> Connect to exist mh or cb Each 750.00 0.00 $0.00 <br /> 4 U concrete walk sf 2.70 0.00 $0.00 <br /> Concrete curb & gutter b618 LF 7.10 0.00 $0.00 <br /> 68 concrete drwy pavement sy 31.00 0.00 $0.00 <br /> Xsplant tree 2-68 CAL Decid. Tree 300.00 0.00 $0.00 <br /> <br />c::::: <br />- <br />I <br />CO <br /> <br />i' <br />I' <br />r <br />" <br /> <br />I <br />