Laserfiche WebLink
<br />-1 <br /> <br /> 30" rc pipe sewer des 3006 clill LF 43.60 0.00 $0.00 <br /> connect to existing san sew Each 350.00 0.00 $0.00 <br /> reconnect san sew srvcs Each 135.00 0.00 $0.00 <br /> 811 X 4" pvc wye Each 25.30 0.00 $0.00 <br /> 411 sdr 26 LF 10.80 0.00 $0.00 <br /> fill & abandon vc pipe sewer LF 1.25 0.00 $0.00 <br /> 8" pvc sdr 35 0-101 depth LF 49.00 0.00 $0.00 <br /> 8" pvc sdr 35 10-12' depth LF 49.00 0.00 $0.00 <br /> 8" pvc sdr 3512-14' depth LF 54.00 0.00 $0.00 <br /> connect to existing wm Each 369.00 0.00 $0.00 <br /> reconnect water service Each 216.00 0.00 $0.00 <br /> hydrant 7-6" bury Each 2357.00 0.00 $0.00 <br /> hydrant 81 bury Each 2380.00 0.00 $0.00 <br /> 3/411 corp stop Each 26.00 0.00 $0.00 <br /> 6" gate valve Each 501.00 0.00 $0.00 <br /> lower ex 6" wm (incl 6" dip) LF 78.40 0.00 $0.00 <br /> 6" wm ductile iron cl 52 LF 18.10 0.00 $0.00 <br /> const drainage sturcture des 48" 4020 Each 1180.00 0.00 $0.00 <br /> const drainage structure des 60" 4020 Each 2132.00 0.00 $0.00 <br /> const drainage structure des 8411 4020 Each 3385.00 0.00 $0.00 <br /> const drainage structure des 24x3611 Each 746.00 0.00 $0.00 <br /> const san mh Each 2727.00 0.00 $0.00 <br /> xtra depth mh over 0-1 01 depth LF 82.00 0.00 $0.00 <br /> sodding type lawn sy 2.50 0.00 $0.00 <br /> modular block retaining wall sf 25.30 0.00 $0.00 <br /> 3/411 type UKII copper pipe LF 9.15 61.00 $558.15 <br />. Total May,2003 19th 5t 0.00 $1 ,024.35 <br /> <br /> <br /> <br />02-5 Ashland <br />May 2003 Pay Req. Remove Bit Curb LF 1.00 0.00 $0.00 <br /> remove sewer pipe - storm LF 8.00 0.00 $0.00 <br /> remove conc drwy pavement Sy 1.50 0.00 $0.00 <br /> common excavation (p) cy 6.00 0.00 $0.00 <br /> topsoil borrow (Iv) cy 8.00 0.00 $0.00 <br /> remove bit pavement Sy 1.50 0.00 $0.00 <br />