<br />3) Approval ofthe Special Use Pennit to allow for impervious surface coverage exceeding 75 <br />percent per Chapter 16, Shoreland Management Ordinance. <br /> <br />4) All disturbed areas on this property shall be stabilized with rooting vegetative cover to <br />eliminate erosion problems. <br /> <br />5) Final approval of the grading, drainage and utility plans by the Public Works Director, and <br />reimbursement for any fees incurred in review ofthe development. The owner assumes all <br />risks associated with the grading and utility placement prior to fonnal approvals. <br /> <br />6) All waste refuse facilities shall be contained in a fully enclosed building. . Dumpsters outside <br />of buildings shall be prohibited. <br /> <br />7) All parking areas must be constructed of bituminous surfacing and concrete curb and gutter. <br /> <br />8) Illumination levels are limited to 0.5 foot candles at the property line as required in the <br />Zoning Code. <br /> <br />9) All lighting shall be downcast and incorporate cut-off shielding to direct light onto parking <br />areas, and away from adjacent properties <br /> <br />10) A drive aisle access must be constructed parallel to the CP railroad tracks to provide access <br />between 2nd Street and Lot 2 as part of Phase 1. <br /> <br />11) All drive aisle widths must be increased to 24 feet in width. <br /> <br />12) Additional surface parking must be added in Phase I to accommodate guest parking. <br /> <br />13) Plans for the Esplanade need to be further developed. Design specifications including <br />esplanade location, elevation, and width must be established prior to Site Plan approval. <br /> <br />14) Construction ofthe bicycle trail at the eastern edge of the property must occur in Phase I. <br />The path will provide a trail link between the river front and Bailey Street. The trail would <br />be further extended south upon Bailey Street reconstruction to further link with the trail <br />system. <br /> <br />15) Blasting will not be allowed for rock excavation, the specific rock removal method must be <br />identified. <br /> <br />16) Any uncompleted site work (including landscaping) must be escrowed for prior to issuance <br />of a certificate of occupancy. <br /> <br />17) Submission of an electronic copy of all plan sets (TIP, PDF, or similar fonnat) prior to <br />recording ofthe Final Plat mylars. <br />