Laserfiche WebLink
Two bids for that have been received and it looks like the cost would be about $72,000. Another <br />option is to use solar powered lights. Only one bid has come in so far for that. For two solar <br />powered lights, the cost would be $14,000. We should be getting a total of 3 bids for that option. <br />Commissioner Brown questioned if we are sure that we own the station. Director Bernstein has <br />the land transfer paperwork with the previous Parks & Recreation Director’s signature on it. <br />Further checking should be done to ensure that the station actually belongs to the City. <br /> <br />8) Director Bernstein passed out a letter from Hoisington Koegler Group Inc. regarding options for <br />the skate park. <br /> <br />MOTION to Adjourn. <br /> <br /> <br /> <br />th <br />Next meeting scheduled for July 12 at 6 p.m. <br /> <br />Adjourned at 6:20 p.m. <br /> <br /> <br />Minutes submitted by: Kristin Behrens <br />