My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-15-05
10.0.0.9
>
City Council
>
CC Packets
>
2000's
>
2005
>
08-15-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2009 8:24:41 AM
Creation date
8/26/2005 12:46:30 PM
Metadata
Fields
Template:
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />improvements shall be subject to inspection and approval by, and shall be <br /> <br />made in sequence as detennined by the Public Works Division. Plans and <br /> <br />specifications for the required improvements shall be submitted to the Public <br /> <br />Works Division in a type and fonnat specified by the Public Works Division <br /> <br />for review and approval. The required improvement plan review fee as <br /> <br />established by City Council resolution shall be paid at this time. <br /> <br />B. fuspection of Public Improvements - Construction of all subdivision street <br /> <br />and utility improvements and other required subdivision improvements shall <br /> <br />be inspected by a City designated inspector for compliance with City <br /> <br />standards, and the approved improvement plans and specifications. The <br /> <br />Public Works Director shall determine the estimated cost of inspection <br /> <br />, <br /> <br />services. The City will pay all improvement inspection costs incurred from <br /> <br />. I <br /> <br />these escrowed funds, o.nd furnish the Developer with copies of all invoices <br />/ <br /> <br />received. The City will also charge 10% of the consultant fees to cover City <br /> <br />overhead and administration costs connected to the inspection services. <br /> <br />Excess funds will be returned to the Developer upon completion and <br /> <br />acceptance of the improvement project. If the funds deposited with the City <br /> <br />are insufficient to cover the inspection costs, the Developer will be required <br /> <br />to deposit additional funds with the City to cover the estimated overage. <br /> <br />C. As-Built Improvement Plan - Upon completion of the required public <br /> <br />improvements, the City inspector shall prepare a record as-built drawing of <br /> <br />the constructed improvements. <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.