Laserfiche WebLink
<br />2-&r% <br />/~.:<~ <br /> <br />Hastings, Minnesota <br />February 25, 1974 <br /> <br />The City Council of the City of Hastings, Minnesota met in a <br />special meeting on Monday, February 25, 1974 at 7:00 o'clock P.M. in the <br />City Council Chambers of City Hall. <br /> <br />~ <br />I <br />I <br /> <br />Members present: Councilmen Collins, Schnirring, Kramer, Novak, <br />Hallberg, Fischer, Driscoll, O'Connor and <br />Mayor Petersen. <br /> <br />Members absent: <br /> <br />None. <br /> <br />The City Clerk reported that this special meeting had been duly <br />called for the purpose of holding public hearings on the 1974 Improvements. <br />The City Clerk presented affidavits showing the due publication and mailing <br />of notice of public hearing for the 1974 Improvement on the following projects: <br /> <br />Proposal I - Bituminous Surfacing, Concrete Curb and Gutter <br />and Sidewalk <br /> <br />Downtown Parking Lot Development on Lots 2,3 and 4, Block 3, <br />Original Town - Bituminous Surfacing, Lighting, Landscaping, <br />etc. Hearing on this project will start at 7:00 P.M. <br /> <br />North Frontage Road from Pleasant Drive to T.H. 55 west of <br />Courthouse entrance - Concrete Curb and Gutter and Bituminous <br />Surfacing. <br /> <br />Brittany Road and the easterly 880 feet of 14th Street within <br />Sontag's Second Addition - Concrete Curb and Gutter and Bitum- <br />inous Surfacing. <br /> <br />Westview Drive from 14th Street to T.H. 55 - Concrete Curb and <br />Gutter, Bituminous Surgacing and necessary Utility extensions. <br /> <br />Bahls Drive from Park Lane to the north line of Lot 7, Block 2, <br />Valley Manor Addition - Concrete Curb and Gutter and Bituminous <br />Surfacing. <br /> <br />Louis Lane within Country Club 2nd. Addition and 19th Street <br />from Pine Street to Louis Lane - Concrete Curb and Gutter and <br />Bituminous Surfacing. <br /> <br />Eddy Street, 16th Street and Spring Street from 15th Street to <br />17th Street - Grading and Gravel Base, Concrete Curb and Gutter, <br />Bituminous Surfacing and Storm Sewer. <br /> <br />20th Street from CSAH 47 to Eddy Street - Grading and Gravel <br />Base, Concrete Curb and Gutter, Bituminous Surfacing and necessary <br />Storm Drainage. <br /> <br />CSAH 42 from 2nd Street to the Regina Medical Office Complex <br />Entrance - Sidewalk Construction. <br /> <br />Proposal II - Sanitary Sewer, Watermain, Storm Sewer, Street <br />Grading and Gravel Base. <br /> <br />Pleasant Drive from Honeysuckle Lane to TH 55 - Sanitary Sewer <br />and Watermain with connecting Sanitary Sewer on 14th Street to <br />Honeysuckle Lane. <br />" <br /> <br />13th Street east of Westview Drive, 13th Place and Unnamed Street, <br />all within Dakota Hills 4th Addition - Sanitary Sewer, Watermain, <br />Street Grading and Gravel Base and Necessary Storm Drainage. <br /> <br />13th Street from Westview Drive to Honeysuckle Lane and Honey- <br />;suck1e Lane from 13th Street to 14th Street, both within Dakota <br />Hills 4th Addition - Sanitary Sewer, Wat erma in , Storm Sewer, Street <br />GRading and Gravel Base. <br />