Laserfiche WebLink
The developer shall pay $300.00 per lot for sewer interceptor fees, $3000.00 for 10 lots, prior to <br />the City signing and releasing the final plat. <br />The developer shall submit landscape plans showing the cul-de-sac islands required for River <br />Shore Court. The developer shall also be responsible for proving that the island will be <br />maintained by some means other than through City involvement. <br />The developer shall plant one %oulevard" tree and one front yard tree per lot. These trees shall <br />be at least two inches in diameter at the base and the species of the tree should be on the list of <br />approved trees Created by the city Forester. This requirement is consistent with what the city has <br />been requiring in other areas. An escrow is required for any unplanted trees before occupancy of <br />any units without trees is allowed. <br /> <br />Upon vote taken, Ayes, 6; Nays, 0. Motion Carried <br /> <br />7. Wallin 9th Addition Final Plat <br /> <br />Acting Community Development Director, Matt Weiland presented background information on this <br />subject. <br /> <br />Commissioner Strauss was concerned about the lots along the Vermillion River and wanted to make sure <br />these lots met shoreland requirements. <br /> <br />Planning Commission Action: <br /> <br />Commissioner Harrington made a motion and Commissioner Donndelinger made a second to <br />recommend approval of the Wallin 9th addition Final plat to City Council subject to the following <br />conditions <br /> <br />The final plat hard shells must be consistent with the approved final plat. <br />The final approval of the final plat is contingent on the rezoning of the property to R-1. <br />The developer shall pay an interceptor sewer charge of $300.00 per single family lot,$7,800.00 <br />for 26 lots, prior to the City signing or releasing the final plat hardshells. <br />The Developer will have to provide access to Outlot A Wallin 9th Addition in one of the <br />following ways to be recorded in the development agreement: <br />1. The developer will grade a trail and grant and access easement along the eastern part of <br /> the swale from the Stone Meadow Dr access trail in Wallin park to the pond in Outlot A <br /> Wallin 9th Addition; or <br />2. The Developer will install bituminous access trails between Lots 3+4 and the Western <br /> side of Lot 1, Block 2, Wallin 9th Addition. This was originally illustrated in the Wallin <br /> 3rd Addition Preliminary Plat. <br />3. The Developer will provide an alternative access to the pond with an understanding that <br /> any access over private property will require an easement and a bituminous trail. <br /> <br />The developer shall provide documentation that common open space and ponding basins in <br />outlots A, B, and C shall be privately maintained by a development association and not the city. <br />The Developer shall modify the plat and development plans to provide a paved driveway access <br />easement to the manhole located between lots 1+2, Block 5, Wallin 9th Addition, for the purpose <br />of sewer access. There must be a turn around area installed and the slope of the drive must not <br />exceed 8%. Maintenance of this drive will be the homeowner's responsibility. This drive will be <br />constructed at the same time as the street improvements. <br />The Developer shall provide a grading plan to the Public Works Director for land to be graded in <br />conjunction with Wallin 9th addition outside of the preliminary platted area.. This grading plan be <br />approved by the Public Works Director and incorporate any of his comments. <br /> <br /> <br />