My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-20-01
10.0.0.9
>
City Council
>
CC Packets
>
2000's
>
2001
>
02-20-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2013 2:38:16 PM
Creation date
10/6/2006 3:25:25 PM
Metadata
Fields
Template:
City Council
City Council - Type
CC Packets
Date
10/6/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />VIII-A-1 <br /> <br />MEMO <br /> <br />To: <br />From: <br />Subject: <br />Date: <br /> <br />Honorable Mayor and City Council Members <br /> <br />Tom Montgomery <br />Informational Presentation - Lock and Dam Access Road and Trail hnprovements <br />January 8, 2001 <br /> <br />The following is some general information about the proposed Phase I Riverfront <br />improvements that I will be presenting to the Council at the January 16th meeting. <br /> <br />I. IMPROVEMENTS , <br />The Phase 1 Riverfront improvements consist of the following improvements; <br /> <br />~ Reconstruct the Access Road - The existing 24 ft. wide Lock and Dam Access Road will be <br />reconstructed with concrete curb and gutter to a 28 ft. width. No parking will be allowed along <br />the roadway. <br /> <br />~ New Alignment - The Lock and Dam Access Road will be constructed on a new alignment <br />beginning at the bottom of the hill coming down from 2nd Street. The new alignment will <br />swing towards Lake Rebecca to create an area for an interpretive center and bandshell. The <br />new alignment will swing back towards the river to enter the Koch tank fann property near the <br />location of the existing main gate. The new alignment will cut through the Koch tank fann <br />property near the river side ofthe old tank locations, before swinging riverward to match the <br />existing access road alignment at the downstream end of the Lock and Dam property. A new <br />entrance to the Mississippi River public access boat ramp will be created that will separate the <br />boat ramp activities from the Lock and Dam Access Road. <br /> <br />~ Trail Extension - The existing Riverfront Trail will be extended upstream from the public <br />access to connect with the existing trail system through the Lock and Dam property. This trail <br />extension will be 10ft. wide and will generally be constructed over the existing road <br />alignment. Another new trail will be constructed from 2nd St. down to match into the existing <br />Riverfront Trail at the bottom of the hill. Due to space constraints and steep side slopes, this <br />trail will be constructed at an 8 ft. width. <br /> <br />~ Storm Sewer - Storm sewer will be installed as part ofthe road improvements. Some of the <br />storm water will be directed to the existing Lake Rebecca outlet pond. Farther upstream, storm <br />water will be discharged into small settlement basins and be allowed to infiltrate over the <br />natural area between the new road alignment and the trail extension. <br /> <br />~ Trail Lighting - Xcel Energy will install decorative lights along the new trail. <br />
The URL can be used to link to this page
Your browser does not support the video tag.