HomeMy WebLinkAboutVIII-06 2nd Reading - Amend City Code Chapter 34.03 - Building Department Electrical Fees
City Council Memorandum
To: Mayor Fasbender and City Council
From: John Hinzman, Community Development Director
Lonnie Johnson, Building Official
Date: August 5, 2024
Item: 2nd Reading\Adopt Ordinance: Amend City Code Chapter 34.03 – Fee Schedule –
Building Safety – Electrical and Electrical Solar Fees
Council Action Requested:
Consider 2nd Reading and final adoption of an amendment to Hastings City Code Chapter 34.03
– Fee Schedule to modify certain Building Safety Fees. The City Council considered 1st Reading
at the July 15, 2024 meeting. A simple majority is necessary for action.
Background:
McMullen Inspecting serves as the electrical inspector for building permits issued by the City.
Earlier this year, McMullen provided a new list of fees for electrical inspections. The fees were
not part of the June 17, 2024 ordinance amendment pertaining to building permit fees. Staff
seeks to incorporate the fees into City Code. A comparison of existing and proposed fees is
attached.
Advisory Commission Review:
N\A
Advisory Committee Review:
N\A
Attachments:
• Ordinance Amendment
• Comparison of Existing and Proposed Fees
VIII-06
1
ORDINANCE NO. 2024-
AN ORDINANCE FOR THE CITY OF HASTINGS, MINNESOTA AMENDING
HASTINGS CITY CODE CHAPTER 34.03 – FEES - BUILDING SAFETY –
ELECTRICAL AND ELECTRICAL SOLAR FEES
The City Council of the City of Hastings, Minnesota does hereby ordain as follows:
SECTION 1. REPEAL AND REPLACE. The Code of the City of Hastings, State of
Minnesota, Chapter 34, Section 34.03, Fee Schedule – Building Safety - Electrical is repealed in
its entirety and replaced as follows:
34.03 FEE SCHEDULE
Building Safety
Electrical
Reconnect Existing Feeder/Circuits (panel board replacement) $100.00
0-250 Volts - Service/Power Supply 0-400 Amp $70.00 each
0-250 Volts - Service/Power Supply 401-800 Amp $140.00 each
0-250 Volts - Service/Power Supply Over 800 Amp $200.00 each
Over 250 Volts - Service/Power Supply 0-400 Amp $140.00 each
Over 250 Volts - Service/Power Supply 401-800 Amp $280.00 each
Over 250 Volts - Service/Power Supply Over 800 Amp $400.00 each
0-250 Volts - Circuit Under 200 Amp $12.00 each
0-250 Volts – Circuit 200 Amp and Above $30.00 each
Over 250 Volts – Circuit Under 200 Amp $24.00 each
Over 250 Volts – Circuit 200 Amp and Above $60.00 each
New One- and Two-Family Dwellings (0-25 Circuits) $200.00 each
Additional Circuits Over 25 Per Unit $12.00 each
Circuits Extended or Modified $12.00 each
New Multi-Family Dwelling Per Unit (3 Units and Larger) $100.00 per unit
Existing One- and Two-Family Dwelling (0-14 Circuits) Per Circuit $12.00 each
Existing One- and Two-Family Dwelling (15 Circuits) $100.00
Retrofit of Existing Lighting Fixtures (Per Fixture) $1.00 each
Separate Bonding Inspection $50.00
Inspection of Concrete Encased Grounding Electrode $50.00
Technology Circuits and Circuits Less Than 50 Volts (per device) $0.75 each
Manufactures Home Park Lot Supply $50.00
VIII-06
2
RV Pedestals (All Circuits Originating in Pedestal Including Factory
Circuit)
$12.00 each
Street, Parking, and Outdoor Lighting Standards $5.00 each
Transformers for Light, Heat, and Power (1-10KVA) $20.00 each
Transformers for Light, Heat, and Power (10 KVA and Larger) $40.00 each
Carnivals, Fairs, and Transient Projects: Min + Power Supplies and Units $174.00
Commercial Remodel – Two Inspections $100.00
Commercial Remodel with Ceiling – Three Inspections $150.00
Pools $100.00
Transformers for Electric Power Supplies and Outline Lighting $5.50 each
Additional Inspection Trip(s), Re-inspections, New Load Management
Devices
$50.00 each
Replacement Load Management Devices $15.00 each
City Service Fee if Including Items Other Than Replacement of Load
Management Devices
$10.00
Reduced City Service Fee (Only for Replacement Load Management
Devices)
$4.00
State Surcharge $1.00
SECTION 2. ADDITION. The Code of the City of Hastings, State of Minnesota,
Chapter 34, Section 34.03, Fee Schedule – Building Safety – Electrical Solar Fees are hereby
added as follows:
Electrical Solar Fees
0-5,000 watts $90.00
5,001 – 10,000 watts $150.00
10,001 – 20,000 watts $225.00
20,001 – 30,000 watts $300.00
30,001 – 40,000 watts $375.00
40,001 – 1,000,000 watts $375.00 plus $25.00 for each additional 10,000 watts over
40,000 watts
1,000,001 – 5,000,000 watts $3,975.00 plus $15.00 for each additional 10,000 watts over
1,000,000 watts
5,000,001 watts or larger $12,975.00 plus $10.00 for each additional 10,000 watts over
5,000,000 watts
SECTION 3. SUMMARY PUBLICATION. Pursuant to Minnesota Statutes 412.191,
in the case of a lengthy ordinance, a summary may be published. While a copy of the entire
ordinance is available without cost at the office of the City Clerk, the following summary is
approved by the City Council and shall be published in lieu of publishing the entire ordinance.
VIII-06
3
The text amendment adopted by the Hastings City Council on August 5, 2024 modifies the
City Fee Schedule pertaining to Building Safety Electrical and Electrical Solar Fees.
SECTION 4. EFFECTIVE DATE. This ordinance shall be in full force and effect from
and after its passage and publication according to law.
Passed this 5th day of August, 2024
_____________________________________
Mary Fasbender, Mayor
Attest:
____________________________
Kelly Murtaugh, City Clerk
Summary Publication Published in the Hastings Journal on August 8, 2024 and August 15, 2024
VIII-06
7/10/24, 6:27 AM Print Preview
https://hastingsmn.municipalcodeonline.com/book/print?type=ordinances&name=Building_Safety 1/2
Electrical
Existing Proposed
0 to 400 Amp Power Source - Commercial $50.00 each $70.00 each – Should be
400 amp not 40
401 to 800 Amp Power Source - Commercial $100.00 each $140.00 each
Over 800 Amp Power Source - Commercial $150.00 each $200.00 each
0 to 200 Amp Circuit or Feeder $8.00 each $12.00 each
Over 200 Amp Circuit Feeder $30.00 each $30.00 each
Fees above shall be doubled if over 250 volts No change in price, but
each category listed
Residential Panel Changes $100.00 each $100.00 (15 circuits) –
Existing Single Family
Dwellling
New 1 & 2 family homes up to 25 circuits, 3 trips $175.00 $200.00 (0-25 circuits)
New Multi-Family Dwelling Per Unit (3 Units and Larger) $100/unit $100/unit
Additional circuits over 25 per unit $8.00 each $12.00 each
Circuits extended or modified $8.00 each $12.00 each
Retrofitting of existing lighting fixtures $0.25 each $1.00 each
Manufactured Home Park Lot Supply and Circuits $50.00 per Ped $50.00 per Ped
Separate Bonding Inspection $40.00 $50.00 each
Inspection of concrete encased grounding electrode $40.00 $50.00
Technology circuits and circuits less than 50 volts $1.00 per
device $0.75 per device
Traffic signals, street, parking and outdoor lighting
standards
$5.00 each $5.00 each
Transformers for light, heat, and power (0 to 10 KVA) $20.00 each $20.00 each
Transformers for light, heat, and power (more than 10
KVA)
$40.00 each $40.00 each
VIII-06
7/10/24, 6:27 AM Print Preview
https://hastingsmn.municipalcodeonline.com/book/print?type=ordinances&name=Building_Safety 2/2
Transformers for electric power supplies and outline
lighting
$5.50 each $5.50 each
Additional inspection trip(s), Re-inspections, new load
management devices $40.00 each $50.00 each
Replacement load management devices $15.00 each $15.00 each
City service fee if including items other than
replacement of load management devices $10.00 $10.00
Reduced city service fee (only for replacement load
management devices) $4.00 $4.00
State Surcharge $1.00 $1.00
RV Pedestals (All Circuits originating in pedestal including
factory circuit
$12.00
Carnivals Fairs, Transient Projects: Min + Power Supplies
& Units
$174.00
Commercial Remodel – 2 Inspections $100.00
Commercial Remodel with Ceiling – 3 Inspections $150.00
Pools $100.00
Electrical Solar Fees
0-5,000 watts $90.00
5,001 – 10,000 watts $150.00
10,001 – 20,000 watts $225.00
20,001 – 30,000 watts $300.00
30,001 – 40,000 watts $375.00
40,001 – 1,000,000 watts $375.00 plus $25.00 for
each additional 10,000
watts over 40,000 watts
1,000,001 – 5,000,000 watts $3,975 plus $15 for each
additional 10,000 watts
over 1,000,000 watts
5,000,001 watts or larger $12,975 plus $10 for
each additional 10,000
watts over 5,000,000
watts
VIII-06