Loading...
HomeMy WebLinkAbout20090615 - VII-1 City of Hastings Parks & Recreation th 920 W 10 St, Hastings MN 55033 Ph: (651) 480-6175 Fax: (651) 437-5396 Web: www.ci.hastings.mn.us “Creating Community Through People, Parks, and Programs” Date: 6/11/09 To: Honorable Mayor and City Council From: Barry Bernstein, Parks and Recreation Director Subject: HFAC Plastering Project th On June 9, the City of Hastings conducted a public open bid for the Hastings Family Aquatic Center plaster project. This project received two bids. Company Base Bid Alternate Bid Mid-America Pool Renovations $259,965 $288,800 Pool Construction, Inc. $206,000 $196,000 The base bid includes a fall completion for the entire project. The alternate bid indicates a fall demolition with a spring completion date. It is staff’s recommendation to accept the Pool Construction, Inc. base bid as it is felt there would not be any concern with weather and possibly a delayed opening. With this said and understanding financial issues the City is currently dealing with, staff would be able to work with the alternate bid. In addition, it is suggested to retain a project engineer for $5,000 to oversee the construction of this project. th This has been discussed at the NRRC meeting on June 9, and the NRRC’s recommendation was to retain Pool Construction, Inc. and go with the alternate bid. Course of action: ? Accept bidder ? Determine base bid or alternate bid ? Decide to retain construction engineer Thank you! Civic ArenaAquatic CenterYouth First th 2801 Red Wing Blvd. 901 Maple Street 920 W 10 Street Ph: (651) 480-6195 Ph: (651) 480-2392 Ph: (651) 480-6182 Fax: (651) 437-4940 Fax: (651) 437-5396 Fax: (651) 437-5396 HFAC Plaster Project City of Hastings Bid Opening June 9, 2009 2:00 p.m. ContractorTimeBase BidAlternate Bid AddendumBid Bond 1 Mid-America Pool Renovations9:43 AMXX$259,965.00$288,800.00 2 Pool Construction, Inc.12:56 PMXX$206,000.00$196,000.00 3 4 5 6 7 8 9 6/11/2009 AQUATIC DESIGN SOLUT/ONS, LLG 17921 Fulda Trail, Lakeville, MN 55044 June 10, 2009 City of Hastings Parks and Recreation Department 920 W. 10th Street Hastings, MN 55033 Attention: Mr. Barry Bernstein, Parks and Recreation Director Subject: Hastings Family Aquatic Center Pool Refinishing Project -Rebid Bid Opening Results and Recommendation Dear Mr. Bernstein: On Tuesday June 9, 2009, we had the publicly read bid opening for the Hastings Family Aquatic Center Pool Refinishing Project -Rebid. There were two bidders for the project, Pool Construction Inc. and Mid-America Pool Renovation, Inc. The bid results table is attached to this letter. Pool Construction Inc. had submitted the low bid for the base bid as well as Alternate Bid #1. The base bid for the project, which has a Substantial Completion date of October 31, 2009, is $206,000. The Alternate Bid #1, which changed the Substantial Completion date to May 14, 2010, was a deduct to the base bid amount for the amount of $10,000. Aquatic Design Solutions, LLC recommends that the base bid be awarded to Pool Construction Inc. The main reason for this recommendation over accepting the Alternate Bid #1 is due to weather concerns. With the base bid, the project will be completed in 2009 and there will not be any impact on opening the facility in May 2010. Whereas if the Alternate Bid #1 were selected, there is significant concern on what the weather may bring causing significant delays in opening the facility. There is a good possibility of a delay for two reasons: 2. The pool vessel needs to be 50 degrees prior to application. With a coal spring, this will become a problem. The City will not want to install the new plaster if the conditions do not meet the manufacturers requirements as this will lead to the plaster failing. 2. Work needs to be completed without rainfall. The contractor needs to have several days of good weather to install the plaster without failures. With the typical springs in Minnesota, rain is common and will affect the contractors' ability to perform the work on time. Because of these likely weather situations, I have recommended the base bid for this project to insure that the residents of Hastings will have a pool to use at the expected beginning of the season. If you have any other questions, please feel free to contact me at 952-356-6047. Thank you. Sincerely, Aquatics Design Solutions, LLC Jody A. Dahms, P.E. President Enc. Hastings Family Aquatic Center Pool Refinishing Project -Rebid Bid Opening Date: June 9, 2009 Time: 2:00 pm CST Where: Hastings City Hall Bidder's Name Base Bid Alternate Bid 1 Mid-America Pool Renovation Inc. Pool Construction Inc. $259,965 $288,800* $206,000 Deduct $10,000 *Note that contractors number written out in words versus numerals did not match and "ADD" or "DEDUCT" not selected. Alternate Bid 1 assumed to be full amount of work for that bid including the base bid.