Loading...
HomeMy WebLinkAboutRiverTownNewsSpring-2005 Rivertown News City of Hastings101 Fourth Street EastHastings MN 55033-1955 phonewebsitee-mail (651) 480-2350www.ci.hastings.mn.uscityhall@ci.hastings.mn.us øøÍÅÎÈÍÅÎêÓÆÍÅÎÈÍÅÎêÓÆ×Ê×ÊÖÊÍÎÈÖÊÍÎÈ øÍÅÎÈÍÅÎêÓÆ×ÊÖÊÍÎÈ øøÍÅÎÈÍÅÎêÓÆÍÅÎÈÍÅÎêÓÆ×Ê×ÊÖÊÍÎÈÖÊÍÎÈ Questions about street construction ê×Ø×Æ×ÐÍÌÏ×ÎÈçÌØÛÈ×ê×Ø×Æ×ÐÍÌÏ×ÎÈçÌØÛÈ× in Hastings? Beginning in May,ê×Ø×Æ×ÐÍÌÏ×ÎÈçÌØÛÈ× ê×Ø×Æ×ÐÍÌÏ×ÎÈçÌØÛÈ×ê×Ø×Æ×ÐÍÌÏ×ÎÈçÌØÛÈ× look for bi-weekly updates on the status of City construction Over the last several months, several projects on the City web site at significant steps have been www.ci.hastings.mn.us. taken towards redevelopment efforts downtown. ùÓÈÃûØÍÌÈÉöùÓÈÃûØÍÌÈÉöùÓÈÃûØÍÌÈÉö×ÎÙ××ÎÙ××ÎÙ× ùÓÈÃûØÍÌÈÉöùÓÈÃûØÍÌÈÉö×ÎÙ××ÎÙ× January: The City Council approved a master plan for ðÛÎØÉÙÛÌ×ìðÛÎØÉÙÛÌ×ìðÛÎØÉÙÛÌ×ìÍÐÓÙÃÍÐÓÙÃÍÐÓÙà ðÛÎØÉÙÛÌ×ìðÛÎØÉÙÛÌ×ìÍÐÓÙÃÍÐÓÙà Sherman Associates which includes a restaurant/banquet ÖÍÊ÷ÛÉ×Ï×ÎÈÉÖÍÊ÷ÛÉ×Ï×ÎÈÉÖÍÊ÷ÛÉ×Ï×ÎÈÉ ÖÍÊ÷ÛÉ×Ï×ÎÈÉÖÍÊ÷ÛÉ×Ï×ÎÈÉ facility facing the river, a mixed-use retail-residential building on Second Street, and a condominium building in between, all East of Tyler Street. Most lots developed in the City over the past 15 to 20 years include front, side and backyard easements to be used for February: The City Council held the public hearing and the underground installation of utilities such as gas, electric, voted to approve the new Tax Increment District #4 in telephone, cable, sewer and water. These easements also February. The district includes property between Tyler and provide for drainage of storm water runoff between lots. the railroad tracks, north of 3 Street to 1 Street, and rdst And in some cases, larger easements have been platted between Ramsey and Tyler Streets, between the alley and to accommodate large storm sewer, watermain or sanitary 1 Street. st sewer pipes, bituminous trails, and ponding basin storm runoff storage. Sherman Associates , the lead developer selected by the City on redevelopment of several blocks, has submitted The Hastings City Council recently adopted the following site and building plans for the first phase: a 28-unit policy regarding fencing and landscaping within easement condominium building, for Planning Commission and City Council review and action. Sherman expects to submit the areas: second and third phases of the redevelopment for consideration in 2006 and 2007. As proposed, Sherman Easement Fencing and Landscaping Policy Associates would build the restaurant building, but will Adopted April 4, 2005 need to partner with a restaurant-operating tenant. The proposed restaurant with outdoor seating facing the river For the purpose of this policy, easements shall be classified and banquet facility for around 300 persons was into the following categories: recommended by the market analysis to increase downtown traffic. 1)Standard lot line drainage and utility easements that do not contain underground storm sewer, sanitary sewer, or Three Rivers Place , a group of private investors, has watermain utilities. acquired property between Ramsey and Tyler Streets, north 2)Drainage and utility easements that contain underground of Second Street. Their concept for Block 2 redevelopment storm sewer, sanitary sewer, or watermain utilities. includes a 49-unit condominium facing the river and a 3)Drainage and utility easements that serve as drainage mixed-use commercial/residential building facing Second ways draining more than one lot. Street. Three Rivers has submitted site and building 4)Drainage and utility easements that serve as ponding plans for their first phase of redevelopment, the basins. condominium building. Volume X 5)Trail or pedestrian easements. Issue 2 Spring 2005 continued on Downtown Redevelopment, Easement Policy, continued on Page 7... Page 1 Page 4...