HomeMy WebLinkAbout20091019 - VIII-A-3MEMO
To: Honorable Mayor and City Council
From: Tom Montgomery
Date: October I2, 2009
Re: Accept Proposal for Intersection Control Evaluation Study for Pleasant
Drive and South Frontage Road Intersection.
Pleasant Drive between 15th Street and Hwy 55 is proposed to be
reconstructed as part of the 2olo Infrastructure Improvement Program. The
intersection of Pleasant Drive and the South Frontage Road has high traffic
volumes. As part of the feasibility study for the proposed Pleasant Drive
reconstruction, staff is recommending an intersection control evaluation study
for the Pleasant Drive and South Frontage Road intersection. The intersection
control evaluation study would determine if addition traffic control, such as all
way STOP, traffic signals, or a roundabout is warranted, and which type of traffic
control best meets the traffic needs of the intersection.
Enclosed for Council approval and authorization is a proposal from SEH to
conduct an intersection control evaluation study for the intersection at a cost not
to exceed $19,000. The funding for this study would come from the 2ol0
construction fund.
COUNCIL ACTION REQUESTED
Council is requested to approve the enclosed intersection control
evaluation study proposal from SEH and authorize the City to contract with SEH
for this work.
a=
~- ,~ ~ ~
_,u;~ ~"~~~ c
~~.._
.~ - j
CTrY~rr kr~4rivF~~
October 7, 2009
Thomas M. Montgomery-
Public Works Director
Citi<- of Hastings
1225 Progress Drive
Hastings, MN 55033
Dear Mr. Montgomery:
RE: City of Hastings
Pleasant Drive/S. Frontage Rd ICE Study
SEH No. 110172
SEH appreciates the opportuniti<- to submit this proposal for traffic engineering services to conduct an
intersection control evaluation (ICE) study for the Pleasant Drive/South Frontage Road intersection. The
Citi<- is planning to reconstruct Pleasant Drive from 15"' Street to High~~ ay 55 and ~~-ants to determine the
t~-pe of intersection control that should be provided at the Pleasant Drive/South Frontage Road
intersection as part of the project.
Based on our discussions ~~ith you, the ICE study ~~i11 be prepared in conformance ~~ith Mn/DOT's
guidelines. The study area is built out, and no ne~y development/re-development in the immediate study
area needs to be included in the traffic forecasts.
Scope of Work
SEH proposes the follo~~ing ~~ork program for this project:
Task 1.0 Data Collection
• Collect and revie~y available traffic count information and traffic studies for the study area.
• Conduct 48-hour tube counts on the approaches of the Pleasant Drive/South Frontage Road
intersection.
• Conduct turning movement counts for the Noon and PM peals period at ri~ o key intersections.
The key intersections are the Pleasant Drive/South Frontage Road intersection and the Pleasant
Drive/High~~ay 55 intersection. From the ADT information provided by the City, it appears the
highest hourly volumes at the Pleasant Drive/South Frontage Road intersection occur around
noon and 5:00 PM, and this is ~~hy ~~e are proposing to use these ri~o peals hours for the traffic
analysis.
• Using crash data available from MnCMAT, revie~y recent 5-year crash history for the Pleasant
Drive/South Frontage Road intersection and prepare a collision diagram for the intersection.
Task 2.0 Traffic Forecasts
• Develop 2030 traffic forecasts for the ri~o key intersections. It is assumed that the forecasts can
be developed by applying an annual gro~~th factor to existing traffic volumes. Forecasts for
average daily traffic (ADT) and for the Noon and PM peals hour ~~i11 be calculated.
Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-5196
SEH is an equal opportunity employer ~ www.sehinc.com ~ 651.490.2000 ~ 800.325.2055 ~ 651.490.2150 fax
Thomas M. Montgomery-
October 7, 2009
Page 2
Task 3.0 Traffic Analysis
• A Synchro/SimTraffic model ~~i11 be developed for the ri~ o key intersections. The
Synchro/SimTraffic model ~~i11 be used for analyzing signalized and unsignalized intersections.
If roundabout control is ~~ arranted at the Pleasant Drive/South Frontage Road intersection, a
VISSIM model ~~i11 be developed and used for the analysis of roundabout control.
• Perform an all-~~ ay stop and signal ~~ arrant analysis for the Pleasant Drive/South Frontage Road
intersection for existing traffic conditions. The analysis ~~-ill determine if any of the traffic
volume All-Way Stop or Signal Warrants from the Minnesota Manual on Uniform Traffic
Control Devices (MnMUTCD) are met at the intersection. If no ~~ arrants are met for existing
conditions, 2030 forecast volumes ~~-ill be analyzed.
• Perform traffic operations analysis for the key intersections for the Noon and PM peals hour.
T~~o scenarios ~~i11 be investigated. These scenarios are the existing conditions and 2030
conditions. The analysis ~~-ill be conducted for each t~-pe of intersection control found to be
~~arranted at the Pleasant Drive/South Frontage Road intersection. The analysis ~~i11 also
investigate the need for other mitigation measures (i.e., addition of turn lanes or thru lanes) at the
kev intersections.
Task 4.0 Intersection Control Evaluation (ICE) Report
• Based on the analysis findings, prepare a draft ICE Report for the Pleasant Drive/South Frontage
Road intersection, using current Mn/DOT report guidelines, and submit the draft report for City
staff revie~~ .
• Address Citi<- comments on the draft report, and prepare a final ICE report.
Task 5.0 Meetings and Project Management
• Attend ri~ o meetings (kick-off meeting and study results presentation meeting) ~~ ith City staff.
• Project management tasks including project invoicing, co-ordination, and status updates.
Schedule and Fees
We propose beginning ~~-ork on the project immediately upon being notified to proceed by the City. We
~~i11 ~~-ork ~~ith the City of Hastings to set a more specific schedule for the project once ~~e have received
authorization to proceed on the project. We anticipate that the project ~~-ill take five ~~eeks to complete.
A detailed staff hour and cost estimate for the project is sho~~m on Attachment A enclosed ~~ith this letter.
We propose to be paid for the ~~-ork ~~e do on an hourly basis, plus the actual cost of reimbursable
expenses. We propose to complete the project for a cost not to emceed $19,000.
We ~~i11 bill you monthly for services, expenses, and equipment. The estimated fee assumes prompt
payment of our bills and the orderly and continuous progress of the project. If the project is delayed and
~~ e encounter additional costs as the result of the delays, it is agreed ~~ e are entitled to additional fees
upon submission of the appropriate documentation of extra costs.
We ~~i11 also furnish such Additional Services as you may request. Payment for additional services shall
be based on the time required to perform the services and the billable rates for the principals and
employees engaged directly on the project, plus charges for expenses and equipment.
Thomas M. Montgomery-
October 7, 2009
Page 3
You agree, to the fullest extent permitted by la~~, to limit SEH's total liability for any and all claims,
expenses, or damages in any ~~ ay related to the services provided under this agreement to the total sum
paid to SEH for providing these services.
This letter and Attachment A represent the entire understanding beri~ een you and us in respect of the
project and may only be modified in ~~riting signed by both of us. If it satisfactorily sets forth your
understanding of our agreement, please sign the enclosed copy of this letter in the space provided belo~~
and return to us.
We appreciate the opportunity to provide the ~~ orlc stated above to the Citi<- of Hastings. George
Calebaugh, PE, PTOE, ~~i11 serve as SEH's project manager for this project. If you have any questions
concerning this proposal, please contact George at 651.7652985.
Sincerely,
SHORT ELLIOTT HENDRICISON INC.
~'`
George Calebaugh, PE, PTOE
Senior Transportation Engineer
Thomas A. Sohi-~~eide, PE, PTOE
Principal/Manager, Transportation Department
Attachment A
c: Nick Egger, City of Hastings
Accepted this day of
2009.
CITY OF HASTINGS, MINNESOTA
B~:
Title:
7
w
U
0
a~
a~
0
t
7
''O^^
VI
0
N
N
Q
a~
V
Q
a
0
a~
vi
a~
2
p
U
+~+ O N 00 ~ N ~
~ ~ N O ~ r
~
p
.~
p O ~ O ~ N j
t ~
V
N
H
_ L
~
V
~ ~
.~ p
~
~
O
N
O
O
p '~ N N C7 ao
a ~
w
~ ~ a~
~ ~o ~
o
~
o c~ o ~
~
L ~ ~ ~
~ a~
w
~ ~
~ o
LL
Q
''
VI
c~
Y ~
N ~
~ U
a~
'
o
~ ~ ~ a
O ca
U '~ ~
U _
L ~
o i° Q ° ~
(~ V U ~ ~_
~
~
~ ~
~ w a~
(a
D H H U ~
0
2 0 0 0 0 0
Y
N ~ N C7 ~ ~
H
~
~
~
p
Q 0
o
o
~
o
ti
~ 0
o
o
o
ao
00
~ 0
o
o
rn
ti
N
~ 0
o
o
c~
~
00
~ 0
o
o
ti
c~ 0
0
0
o
o
~
~
L
p
0
_
~
^ ~
~
O ~ 0
0 M ~ ~ W
2
L O
~
~+
O
O
O
~ p
H p 0 0 0 ~
° z
Q 3~ o 0 0
U +~
~ o ~ ~ rn N
H ~ ~ ~ ~ U
~
W ~ H
~
~
O O ~ O
~ ~ ~
~
~
o -
~
N J ~
~ ~
U L L
U
O
p ~ ~ ~ `.
Q ~ W ~~ N
~.
~. U
to
W ~ ~ ~ N
O O ~ ~
d d ~ W