HomeMy WebLinkAbout20091019 - VII-1 & VIII-A-1
MEMO
To:
Honorable Mayor and City Council
From:
Nick Egger – City Engineer
Date:
October 14, 2009
Re:
Public Hearing – 2008 Infrastructure Improvement Program Assessments
The Public Hearing for the 2008 Infrastructure Improvement Program Assessments will
include the following projects:
thththth
2008-1 North Vermillion Area
– 6, 7, 8, and 9 Streets west of Vermillion
thth
Street (TH 61) to Spring Street, Spring Street between 6 Street and 10
ththth
Street, Eddy Street from ½ block south of 5 Street to 10 Street, 7 and
th
8 Streets east of Vermillion Street to Bailly Street, and Sibley Street
thth
between 6 Street and 8 Street, alleys from Vermillion Street west to
thth
Eddy Street between 6 and 8 Streets, and the alley from Vermillion
thth
Street east to Sibley Street between 7 and 8 Streets
nd
2008-2 Downtown Street & Watermain
– Ramsey Street north of 2 Street, on
ndstst
Tyler Street north of 2 Street to 1 Street, and on 1 Street from Tyler
Street east to Lea Street, Trunk Watermain construction between TH 61
right-of-way and Lea Street, new street lighting on Ramsey and Tyler
nd
Streets north of 2 Street, and bituminous trail construction between the
strd
intersection of Tyler and 1 Streets south to the intersection of 3 and
Bailly Streets.
AP
SSESSMENT OLICY
Under the City’s assessment policy, assessments are based on the benefit received from
the improvement and not on the cost to construct the improvement. Benefit is defined as
the increase in property value directly attributable to improvement constructed. The
policy assesses properties based on 90% of estimated benefit received from the
improvements and reduces the assessment to the long side of a corner lot to 25% of the
estimated benefit front foot cost. Properties that abut alleys which are reconstructed are
also assessed for 25% of the abutting frontage.
P2008-1,NVA
ROJECT ORTH ERMILLION REA
PFS
ROJECT UNDING UMMARY
FS A
UNDING OURCESMOUNT
Assessments$561,973.00
Water Fund $581,822.21
Wastewater Fund$491,237.56
Bonded Debt $1,180,492.23
Total Project Costs $2,815,525.01
I
MPROVEMENTS
This project consisted of the complete reconstruction of streets, sidewalks, and storm
sewers in the North Vermillion Area streets as described above, and complete
replacement of water and sanitary sewer utilities.
AR: $60/Frontage Foot
SSESSMENT ATE
This rate is unchanged from the February2008 Feasibility Report
P2008-2DS&W
ROJECT OWNTOWN TREET ATERMAIN
PFS
ROJECT UNDING UMMARY
FS A
UNDING OURCESMOUNT
Assessments$79,117.18
Water Fund $266,629.28
Wastewater Fund$59,617.46
WAC Fund $395,468.44
Dakota County CDA Grant $250,000.00
Bonded Debt $535,740.24
Total Project Costs $1,586,572.60
I
MPROVEMENTS
This project involved reconstruction of utilities and street surfaces on both Ramsey and
ndst
Tyler Streets north of 2 Street, and replacement of pavement on 1 Street from Tyler
Street to Lea Street. A trunk watermain was installed through Levy Park from near the
st
Highway 61 right of way on the western end of the park and beneath 1 Street to Lea
nd
Street, with a connection to a roughed in section of watermain beneath 2 Street near the
CP Railroad crossing along the eastern side of the recently replatted Riverfront Addition.
New street lighting was installed on Ramsey and Tyler Streets in the project area, and a
new trail segment was also constructed along the eastern side of the Riverfront Addition,
rd
south through Block 16 to 3 Street.
AR:
This project was also assessed on a $60/front foot rate, with the vast
SSESSMENT ATE
majority of the assessment falling on the parcels in the Riverfront Addition. The City
also made an agreement to waive the assessment that would have been placed on the
Graphic Design property in exchange for the concession of a piece of property covering a
portion of Tyler Street such that it would be reverted back to City right-of-way.
CAR
OUNCIL CTION EQUESTED
Council is requested to approve the enclosed resolutions adopting the proposed
assessments for the 2008 Street and Utility Improvement Programs.
CITY OF HASTINGS
DC,M
AKOTA OUNTY INNESOTA
Resolution No.
RA
ESOLUTION DOPTING THE ASSESSMENTS FOR THE
2008-1NVASUI
ORTH ERMILLION REA TREET AND TILITY MPROVEMENTS
WHEREAS
pursuant to proper notice duly given as required by law, the City Council of
,
the City of Hastings has met, heard, and passes upon all objections to the proposed
assessments for the improvements of:
thththth
2008-1 North Vermillion Area
– 6, 7, 8, and 9 Streets west of
?
th
Vermillion Street (TH 61) to Spring Street, Spring Street between 6 Street
thththth
and 10 Street, Eddy Street from ½ block south of 5 Street to 10 Street, 7
th
and 8 Streets east of Vermillion Street to Bailly Street, and Sibley Street
thth
between 6 Street and 8 Street, alleys from Vermillion Street west to Eddy
thth
Street between 6 and 8 Streets, and the alley from Vermillion Street east to
thth
Sibley Street between 7 and 8 Streets
These improvements included street, water, sewer, and storm sewer reconstruction, and
sidewalk construction and reconstruction.
NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
HASTINGS AS FOLLOWS:
The proposed 2008-1 North Vermillion Area Improvement Program assessments,
1.
a copy of which is filed with the Hastings Engineering Department, are hereby
accepted and shall constitute the special assessment against the lands named
therein, and each tract of land therein included is hereby found to be benefited by
the constructed improvement in the amount of the assessment levied against it.
2. Such assessment shall be payable in equal annual installments extending over a
period of ten (10) years, the first of the installments to be payable with the first
property tax installment of 2010, and shall bear interest at the rate of 5.50% per
annum from November 18, 2009. To the first installment shall be added interest
on the entire assessment from November 18, 2009 until December 31, 2009. To
each subsequent installment, when due, shall be added interest for one year on all
unpaid installments.
3. The owner of any property so assessed may, at any time prior to certification of
the assessment to the County Auditor, pay the whole or part of the assessment on
such property with interest accrued to the date of the payment to the City Clerk,
except that no interest or Dakota County assessment certification fee shall be
charged if the entire assessment is paid within 30 days from the adoption of this
resolution; and he may, at any time thereafter, pay to the County Treasurer the
entire amount of the assessment remaining unpaid with interest accrued to
December 31 of the year in which such payment is made. Such payment must be
made before December 30, or interest will be charged through December 31 of
the next succeeding year.
4. The clerk shall forthwith, transmit a certified duplicate of this assessment to the
County Auditor to be extended on the property tax lists of the Count, and such
assessments shall be collected and paid over in the same manner as other
municipal taxes.
$561,973.00
5. The amount specially assessed is hereby declared to be .
th
ADOPTED BY THE CITY COUNCIL OF HASTINGS, MINNESOTA, THIS 19
DAY OF OCTOBER, 2009.
Ayes:
Nays:
Paul J. Hicks, Mayor
ATTEST:
Melanie Mesko Lee, City Clerk
(Seal)
CITY OF HASTINGS
DC,M
AKOTA OUNTY INNESOTA
Resolution No.
RA
ESOLUTION DOPTING THE ASSESSMENTS FOR THE
2008-2DS&WI
OWNTOWN TREET ATERMAIN MPROVEMENTS
WHEREAS
pursuant to proper notice duly given as required by law, the City Council of
,
the City of Hastings has met, heard, and passes upon all objections to the proposed
assessments for the improvements of:
nd
?
2008-2 Downtown Street & Watermain
– Ramsey Street north of 2
ndstst
Street, on Tyler Street north of 2 Street to 1 Street, and on 1 Street
from Tyler Street east to Lea Street, Trunk Watermain construction
st
through Levy Park between the TH 61 right-of-way and along 1 Street to
nd
Lea Street, new street lighting on Ramsey and Tyler Streets north of 2
Street, and bituminous trail construction between the intersection of Tyler
strd
and 1 Streets south to the intersection of 3 and Bailly Streets.
These improvements included new concrete median construction, vehicle gate installation
and bituminous paving.
NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
HASTINGS AS FOLLOWS:
The proposed 2008-2 Downtown Street & Watermain Improvement Program
1.
assessments, a copy of which is filed with the Hastings Engineering Department,
are hereby accepted and shall constitute the special assessment against the lands
named therein, and each tract of land therein included is hereby found to be
benefited by the constructed improvement in the amount of the assessment levied
against it.
2. Such assessment shall be payable in equal annual installments extending over a
period of ten (10) years, the first of the installments to be payable with the first
property tax installment of 2010, and shall bear interest at the rate of 5.50% per
annum from November 18, 2009. To the first installment shall be added interest
on the entire assessment from November 18, 2009 until December 31, 2009. To
each subsequent installment, when due, shall be added interest for one year on all
unpaid installments.
3. The owner of any property so assessed may, at any time prior to certification of
the assessment to the County Auditor, pay the whole or part of the assessment on
such property with interest accrued to the date of the payment to the City Clerk,
except that no interest or Dakota County assessment certification fee shall be
charged if the entire assessment is paid within 30 days from the adoption of this
resolution; and he may, at any time thereafter, pay to the County Treasurer the
entire amount of the assessment remaining unpaid with interest accrued to
December 31 of the year in which such payment is made. Such payment must be
made before December 30, or interest will be charged through December 31 of
the next succeeding year.
4. The clerk shall forthwith, transmit a certified duplicate of this assessment to the
County Auditor to be extended on the property tax lists of the Count, and such
assessments shall be collected and paid over in the same manner as other
municipal taxes.
$79,117.18.
5. The amount specially assessed is hereby declared to be
th
ADOPTED BY THE CITY COUNCIL OF HASTINGS, MINNESOTA, THIS 19
DAY OF OCTOBER, 2009.
Ayes:
Nays:
Paul J. Hicks, Mayor
ATTEST:
Melanie Mesko Lee, City Clerk
(Seal)