Loading...
HomeMy WebLinkAboutPCMinutes-20060911City of Hastings Planning Commission Minutes – September 11, 2006 Page 1 of 4 Hastings Planning Commission September 11, 2006 Regular Meeting 7:00 p.m. Chairman Twedt called the meeting to order at 7:01 p.m. 1.Roll Call Commissioners Present: Peine, Zeyen, Truax, Twedt, Schmitt, McInnis, Hiedeman Staff Present: Planning Director John Hinzman 2. Approve August 28, 2006 Planning Commission Meeting Minutes Motion by Commissioner McInnis to approve the minutes of the August 28, 2006 Planning Commission meeting as presented, seconded by Commissioner Truax. Upon vote taken, Ayes: 7, Nays 0. Motion passed. th 3. Synergy Development, Cont. – Site Plan #2006-41 – Glendale Heights 4 Addition\Eagle Pointe Apartments – Voyageur Parkway Director Hinzman presented the staff report. Commissioner Truax asked for clarification between the NFPA 13 and 13R fire sprinklering systems. Director Hinzman explained he understood the NFPA 13 system to be commercial in nature and the 13R to by residential. Commissioner Schmitt asked if the NFPA 13 system would be required for all comparable residential buildings. Director Hinzman stated that was his belief. Planning Commission Action: Commissioner Truax motioned and Commissioner McInnis seconded approval of the Site Plan subject to the conditions of the staff report with the following modification: Eliminate Condition No. 16b – construction of a fire access road in lieu of a NFPA 13 system. City of Hastings Planning Commission Minutes – September 11, 2006 Page 2 of 4 Commissioner Schmitt requested that the condition be left in, and that the applicant have the discretion to choose either option 16a of 16b. Commissioner Truax and Commissioner McInnis accepted the amendment to approve the Site Plan subject to the conditions of the staff report as follows: 1) Conformance with the plans submitted with the Planning Commission staff report of September 11, 2006. th 2) Recording of the Final Plat of Glendale Heights 4 Addition. 3) All parking and drive aisle areas shall be constructed to City standards including bituminous surfacing and concrete curb and gutter. 4) All disturbed areas on this property shall be stabilized with rooting vegetative cover to eliminate erosion problems. 5) The disturbed areas of the site shall be maintained to the requirements of the City’s property maintenance ordinance. 6) Monument signs shall be architecturally consistent with the buildings on site and incorporate similar materials into their construction. 7) Lighting must incorporate cut-off shields and be directed onto parking lot areas. 8) All landscaping and plantings shall be irrigated. 9) Outside dumpsters are prohibited. All waste and recycling shall be located within the building or within an accessory building matching architectural appearance. 10) Final approval of the utility plans by the City of Hastings Fire Department. 11) A second parking lot entrance must be provided added to the satisfaction of the Planning Director. 12) A negative ventilation system will be required to remove smoke due to the limited access/egress in the parking garages. This system would be automatic and manually controlled from a remote location. 13) Existing boulevard trees adjacent to the site along Voyageur Parkway that are dead or dying must be replaced to the satisfaction of the City Forester. 14) Replace the silver maple trees with another species to the satisfaction of the City City of Hastings Planning Commission Minutes – September 11, 2006 Page 3 of 4 Forester. 15) The landscaping plan must be modified so no more than 50% of one species is used. Address fire suppression system concerns with one of two options presented by the 16) Fire Marshall. These options are: a) Sprinkle the entire building with a 13R system and place a 10- 12 foot walking path/emergency access path built to city standards on either the north or west side of the building. b) Sprinkle the entire building with a NFPA 13 system. This would not involve a change to the building location as a walking/emergency access path would not be required. 17) The walking path/emergency access path must be maintained by the building owner during all seasons, including snow removal in the winter. 18) Any rooftop equipment must be completely screened from the front elevation, any part of the roof top equipment that is visible from any other elevation must be painted to match the building on which the equipment sits. 19) The Landscape plan must be modified to meet minimum shrub and tree requirements of the Landscape Ordinance. 20) An escrow account must be established to ensure completion of outstanding site improvements, including landscaping prior to certificate of occupancy. 21) Submission of an electronic copy of all plan sets (TIF, PDF, or similar format) prior to issuance of certificate of occupancy. 22) Approval is subject to a one year Sunset Clause; if significant progress is not made towards construction of the proposal within one year of City Council approval, the approval is null and void. 23) On the west side of the property, a buffer of trees similar to the size, placement, and number of existing trees buffering the industrial park shall be planted. 24) At least 25 percent of the building must be covered by Class 1 materials. 25) At least 25 percent of the building must be covered by Class 2 materials. Upon vote taken, Ayes: 7, Nays 0. Motion passed. City of Hastings Planning Commission Minutes – September 11, 2006 Page 4 of 4 4. Other Business Director Hinzman updated the Commission on previous Council activities. 5. Adjourn The meeting was adjourned at 7:12 p.m. Respectfully submitted, _____________________________ John Hinzman Recording Secretary