HomeMy WebLinkAbout20180709 - VI-10 - Approve Change Order No. 2 RR Phase 3.1 Improvements City Council Memorandum To: Mayor Hicks & City Council Members From: Nick Egger – Public Works Director Date: July 2, 2018 Item: Approve Change Order #2 for Riverfront Renaissance Phase 3.1 Improvements COUNCIL ACTION REQUESTED Council is requested to approve the attached change order to the contract for Phase 3.1 of the Riverfront Renaissance program. BACKGROUND INFORMATION The Change Order sets a unit price on an item that was previously included as a small part of a lump sum expense within the contract. The item, an additional controller “brick”, is necessary to add to the lighting control system to produce capability for operating the aesthetic lighting on the Bridge. It was determined after additional field investigation work that two of these bricks would be necessary rather than the one included in the original contract as part of a larger lump-sum item. Sam Kessel of Bolton & Menk has provided elaboration on the various adjustments and added work items in the attached memo to help explain the background. FINANCIAL IMPACT The value of the items contemplated by Change Order #2 is a $575.94 increase to the total contract value, about a 0.11% increase. Overall, change orders to date represent an increase to the original contract value of 1.63% Below is a table summarizing to date the Change Orders to this contract. Riverfront Renaissance Phase 3 Change Order Summary Change Order Date Item Estimated Value 1 5/16/2018 Increased Size of Electrical Trough, Additional Hand Hole, & Dumpster Enclosure Door Reconfiguration. $7,736.46 2 7/2/2018 Additional Echelon Control Unit – Bridge Aesthetic Lighting $575.94 Net Total Increase/(Decrease) to date $8,312.40 Original Contract Value $509,430 Change Orders as Percentage of Contract Value to date 1.63% STAFF RECOMMENDATION The change order will result in a small increase of the total contract value and construction costs, but the changes are necessary for proper functionality of the resulting infrastructure. Staff recommends that the Council approve Change Order #2. H:\HAST\T18113249\7_Construction\A_Revisions\Change Order #4\CHANGE ORDER 2.docx CHANGE ORDER #2 Date: July 1, 2018 To: Nick Egger, City of Hastings From: Bolton & Menk, Sam Kessel Subject: Memorandum on Change Order #2 Items Riverfront Renaissance Improvements – Phase 3.1 City of Hastings, MN City Project Number: 2018-2 The following is a summary of Change Order #2 request and explanation of cause. Bolton & Menk has been coordinating with Barr Engineering and Global Specialty Contractors for the installation of the electrical control system that will tie into and control the existing lighting system under the bridge. Upon further investigation of the existing system it has been determined that on additional Echelon controller is needed to establish a proper connection. With this additional controller, the lights under the bridge will be able to be brought online with the Echelon system that runs all of the downtown and park lights. The following bid item is requested to be added to the construction contract due to items that were not foreseen at the time of bid. x 4-A – Echelon Controller 7/2/2018