Loading...
HomeMy WebLinkAboutVIII-04 Approve Budget Amendment - Veteran's Athletic Complex - Baseball Field Scoreboard City Council Memorandum To: Mayor Fasbender & City Councilmembers From: Chris Jenkins, Parks & Recreation Director Date: March 7, 2022 Item: Budget Adjustment Council Action Requested: Approve budget adjustment to spend dedicated funds to partially fund replacement of the Vets Baseball Field Scoreboard. Background Information: The scoreboard at Vets Baseball Field was installed in the early to mid-1980’s, and has served more than its useful life. Until the last couple of years, refurbished electronic replacement parts have been available to keep the scoreboard alive. Currently, there are critical functions of the scoreboard that do not work, and no replacement parts are available. This is the only scoreboard the City owns at the athletic complex, and it is an essential component of the baseball field, baseball environment, and atmosphere of a ball game. In recent years, the Hastings Hawks have invested money, effort and a lot of time to enhance the facilities at the baseball field. The Hastings Hawks and others in the baseball community have also contributed to build the press box, build the concessions/restroom building, build the maintenance shed and dugouts. The presence of a scoreboard at Vets Baseball Field certainly adds to the experience, and as a City owned asset that has failed, it is time to replace it. Both the Hastings Hawks and Hastings Youth Athletic Association have pledged funding to help with this replacement project. Financial Impact: Total project cost: $32,261.00 City dedicated funding specific to Veterans Athletic Complex: $17,300.00 Hastings Hawks commitment: $7,500.00 Hastings Youth Athletic Association commitment: $7,500.00 Advisory Commission Discussion: None Council Committee Discussion: None Attachments: ▪ Scoreboard proposal VIII-04 DATE: March 2, 2022 TO: Bruce Karnick Hastings Hawks Baseball 651-398-2495 maveric1369@gmail.com FROM: John Grabow RE: DAKTRONICS LED BASEBALL SCOREBOARD AND ACCESSORIES Thank you for giving AIM Electronics the opportunity of presenting you an updated proposal for the purchase of a new baseball scoreboard and accessories for the City of Hastings Parks and Recreation. Per your verbal specifications, I have attached a price quotation on the Daktronics Model BA-2026 and Daktronics Model BA-2125 baseball scoreboards and accessories. The new LED technology is rated for minimal maintenance, has lower power consumption and greater visibility in direct sunlight. As you know, AIM Electronics is the area representative for Daktronics. We provide sales, installation and local service, in addition to an excellent warranty policy and exchange program which minimizes the cost of any repair. We have been serving the area’s scoring and display needs for over thirty-five (35) years. I will contact you no later than March 16, 2022 to hear your decision. If you have any questions, please call me at 952-941- 9830. Enclosures JG: VIII-04 City of Hastings PRICE QUOTATION March 2, 2022 DAKTRONICS LED BASEBALL SCOREBOARD AND ACCESSORIES Description Size (HxWxD) Qty. Price 1. Model BA-2026-Amber LED Baseball Scoreboard With Border Stripe and B/S/O Stripe 9’4” x 36’ x 8” 1 $21,860 2. Electronic Team Name Message Centers 1 set 4,731 3. Wireless Radio Receiver 1 435 4. Installation and Training (Budgetary)* 4,250 5. Shipping and Handling 985 $32,261 Options: 1. Daktronics MX-1 App-Based Control** . . . . . . $915 2. Daktronics 1205-36 Non-Backlit Dome Panel Including Decoration (5’ x 36’ x 8”) . . . . . . . . $5,235*** VIII-04 City of Hastings PRICE QUOTATION March 2, 2022 DAKTRONICS LED BASEBALL SCOREBOARD AND ACCESSORIES (Cont.) *Outdoor Installation Notes: AIM Electronics will remove existing scoreboard, weld on I-beam extensions for new dome panel, mount new scoreboard/dome panel & provide in-person operator training once electrician has completed final connections. Disposal of crating/packaging materials is responsibility of customer; AIM Electronics will put crating/packaging materials in dumpster of customer’s choice. Landscape repair if required is not included in proposal. Standard Exclusions: Electrical installation must be completed by a licensed electrician hired by customer. AIM Electronics requires full access to the facility for the duration of the installation to include but not limited to: Lifts, ladders, power tools, etc. AIM Electronics is not responsible for the integrity of existing walls, structures, etc. Installation subject to change based on final engineered drawings (if applicable). **Daktronics MX-1 App-Based Control with Weatherproof box requires power be brought to and connected to it by electrician hired by customer. AIM will mount the box at the time of installation. ***Does not include installation; extensions may be needed to existing I-beams to make this addition possible. OTHER INFORMATION:  Five (5) year warranty  Twelve-to-Fourteen (12-14) week lead time  30% down payment, balance due 30 days after shipping  Prices valid for 60 days  Tax will be charged to exempt entities unless a certificate of exemption is provided at the time of contract execution VIII-04