HomeMy WebLinkAbout03/23/70cc: Walt Petersen 3-26-70
CITY OF HASTINGS
MINUTES OF HASTINGS PLANNING COMMISSION MEETING
HELD MONDAY, MARCH 23, 1970
The meeting convened at the Hastings Public Library meeting room at 7:30 P.M.
Those present:
Mr. Walt Petersen, Mr. Orvin Moen, Mr. Leonard Bauer,
Mr. Don Hallberg and Mr. Clarence Soleim.
Also present:
Mr. and Mrs. Leo Schumacher, Don Hess from Midwest
Planners and City Engineer John Davidson.
Because of the conflict between the Council Meeting and Planning Commission
meeting, a quorum was not present at the Planning Commission Meeting until
approximately 9:30 P.M. at which time the Commission was called to order.
The first item on the agenda was the approval of the minutes of the meeting of
March 9, 1970. It was moved by Mr. Moen, seconded by Mr. Bauer to approve
the minutes as furnished and unanimously passed.
The next item was a presentation by Mr. Don Hess of Midwest Planners. Mr. Hess
was requesting formal action in accordance with a letter dated March 18, 1970.
Mr. Hess asked what legal requirements were necessary for a formal petition
for rezoning. These were outlined by the City Engineer; requiring the necessary
75% of frontage abutting the property to be rezonedwithin 100 feet. Mr. Hess
was asking that an action rezoning be allowed for industrial zoning for the Mobile
Home Park, R-3 for the Multiple Dwelling area, and C-1 for the Commercial zone,
in accordance with the site plan furnished.
It was suggested that a preliminary plat showing outlots, be furnished prior to
request for rezoning so that the platting could be taking place at the same time
that any rezoning would be accomplished on the property. This would eliminate
the cumberson metes and bounds description for zoning purposes. Mr. Hess
suggested favorable consideration based upon previous presentation, this same
type of development in other communities and the tax structure being compatable
for at least seven years, at which time it is expected that the tax structure would
change on Mobile Home Parks.
Mr. Moen said that there was certainly a question in his mind, if not all of the
members of the Planning Commission on what could be done to maintain the aesthetics
as proposed, what could be done to insure that the policy proposed would be carried
out if there was a change in ownership of the property involved. What control could
the City place on the subdivision to maintain the level of school aged children and is,
in fact, this type of development good, or in the best interest in this particular
Minutes of Hastings Planning Commission
Meeting held Monday, March 23, 1970
Page 2.
location. Mr. Hess stated that these same questions were asked about multiple
dwellings in the past, and that from a planning point of view, this is, in fact a
good location for a mobile home court because of the natural topography and
because of the fact that the area is visible from Highway 55 and that a planned
view of the area can be seen from the highway by-passing the route of the low
area in which the mobile homes will be situated.
It was then asked by the Planning Commission Chairman exactly what the
Planning Commission was to decide tonight. Mr. Hess asked, first of all the
Commission must decide what legal procedures are required, and what they can
do to have the property platted and rezoned, and if necessary the rezoning, for
instance in the mobile home area be on an interim basis or zoned commercial
with a special use permit. It was explained that on a special use permit, this
also was required by an informal petition and action by the City Council to grant
a special use based upon retention of ownership and change in use. Mr. Hess
then called for a straw vote from the Planning Commission, either against or in
favor of the Mobile Home Park in this area. Mr. Moen and Mr. Petersen were
in favor of proceeding to the final plan stage, Mr. Soleim, Mr. Haliberg and
Mr. Bauer were against any further planning until it was decided whether this
was in fact the best use of this particular land area.
The meeting was adjourned at approximately 10:30 P.M. The next meeting
will be held on Monday, April 13, 1970 at 7:30 P.M. at the Hastings Public
Library.
John Davidson, City Engineer
CITY OF HASTINGS
March 30, 1970
TO:
FROM:
PLANNING COMMISSION MEMBERS:
Mr. Don Hallberg
Mr. Don Fluegel
Mr. Arland Siebrecht
Mr. Leonard Bauer
Mr. Ed Fischer
Mr. Orvin Moen
Mr. Clarence Soleim
MR. WALTER PETERSEN, CHAIRMAN
In the notice of our past ]Planning Commission Meeting, I expressed the
intention of dividing the Planning Commission into sub-committees for the
purpose of expediting the completion of the Zoning Ordinance.
Due to lack of time during the last meeting, we did not do this, consequently,
I am taking this means of doing so.
Mr. Moen and Mr. Bauer
Mr. Fischer and Mr. Hallber~
Mr. Soleim and Mr. Siebrecht
Review Chapters 1 through 9
Review Chapters 9 through 15
Review Chapters 16 thro, ugh ZZ ~
I am quite sure that Mr. John Davidson, Mr. Don Fluegel and I will make
ourselves available for help whenever called upon.
WP:d~