PROJECT 2006-1, 3R° STREET AREA <br />PROJECT FUNDING SUMMARY <br />FUNDING SOURCES AMOUNT <br />Assessments $569,203.30 <br />HRA TIF Funding $556,973.75 <br />Water Fund $836,071.35 <br />Wastewater Fund $564,907.87 <br />Bonded Debt $733,183.60 <br />Total Project Costs $3,260,339.87 <br />IMPROVEMENTS <br />This project consisted of the reconstruction of streets in the 3ra Street area, and select <br />replacement of water and sanitary sewer utilities. Major street and streetscape <br />renovations included the widening of Eddy Street from f32 feet to 36 feet between 2nd <br />Street and 5`~' Street, the addition of sidewalk to Eddy Street between 2nd Street and 5`h <br />Street, the narrowing of State Street from 40 feet to 36 feet, the construction of a cul-de- <br />on the far west end of 3rd Street, and the addition of street fighting along Eddy Street. <br />ASSESSMENT RATE: $60.30/FF for properties not previously having curb and gutter <br />$30.15/FF for properties that previously had curb and gutter <br />These rates are uuchanged from the April 2006 Feasibility Report <br />ASSESSMENT ISSUES <br />There is a pocket of lots that obtain access to 3rd Street through a common driveway just <br />to the west of Maple Street. These lots, although not fronting on any part of the project, <br />did receive benefit as a result of the improved access and were assessed as corner lots <br />with long side improvements, meaning that their assessments were based on 25% of the <br />width of their lots on the side that runs parallel to 3rd Street_ <br />PROJECT 2000-2 NORTH FRONTAGE ROAD <br />PROJECT FUNDING SUMMARY <br />FUNDING SOURCES AMOUNT <br />Assessments $61,537.50 <br />WAC Fund $499,720.02 <br />Bonded Debt $243,109.15 <br />Total Project Costs $804,366.b7 <br />IMPROVEMENTS <br />This project involved construction of two trunk watermains between State Street and the <br />site of the new Water Treatment Plant. The watermains run through Lion's Park to the <br />southwest where they traverse up the embankment to North Frontage Road near Tires <br />Plus. From that point, the watermains proceed along the south side of North Frontage <br />2 <br />