Laserfiche WebLink
<br />GGG <br />Engineering Suræying & Planning <br /> <br />14070 Hwy 52 S.E., Chatfield, MN 55923, ph. 507-867-1666 <br />1653 South VIctoria Road, St. Paul, MN 55118, ph. 651-688-3448 <br /> <br />May 19th, 2003 <br /> <br />John Hinzman <br />Gty of Hastings <br />104 - 4th Street East <br />Hastings, 11N 55033 <br /> <br />RE: Glendale Heights, Hastings :MN <br /> <br />Dear Mr. Hinzman, <br /> <br />As you requested this letter is in response to the letter received from Michael King, <br />Metropolitan Council (dated March 21, 2003), requesting additional information. <br /> <br />Qiestim # 1. Did the rœuduation irKlude a study if the likely irrpaa if the mtd e<:tensiaz an the <br />habitat? ~ did the City anlude as a result if its rœuduationi Yes, During the EAW Process <br />the Gty reevaluated the impacts of alternate alignments and concluded alternative <br />alignments would pose a greater barrier impact on the habitat than the current proposed <br />location. Construction in the ravine has the smallest footprint unless, retaining walls are <br />used in the alternative alignments. If retaining walls are used with the alternative alignments <br />a greater impact on the wildlife corridor is realized, because retaining walls create a greater <br />barrier to the wildlife. Construction in the ravine preserves developable land used for <br />homes. If the alternative alignments are used, less developable land results in poor use of <br />land in terms of urban planning, increasing the pressures of urban sprawl. <br /> <br />Qiestim # 2. What; if a~ trajfi£ rriti¡ptim irrpraœrmTts W1l /æ urrlertakeni The Gty is <br />committed to addressing the traffic issues. û>nstruction of the Spiral Boulevard connection <br />is an integral part of mitigating the Gtÿs traffic issues. The Gty has completed a traffic <br />. study and is evaluating what actions that will be undertaken both as apart of this project and <br />beyond. <br /> <br />A ddiJionally -uhat, if a~ errri:rurrtrmta rriti¡ptim Wll/æ urrlertaken <br /> <br />. The project is designed for the water to be directed to the interior six infiltration <br />basins, reducing erosion, removing sediment, improving water quality, and <br />reducing flows. <br /> <br />