Laserfiche WebLink
<br />5/29/2003 <br /> <br />. The project will meet all the requirements of the Gty of Hastings Tree <br />Preservation Plan resulting in more trees than exists today. <br /> <br />. The project includes preserving 63% of the native woodland vegetation. <br /> <br />. The proposed Spiral Boulevard is designed with a narrower street section in the <br />ravine in order to minimize impact on the ravine. <br /> <br />. The project will meet all the requirements of the MPCA and the Gty of <br />Hastings Erosion Control Ordnance. Special provisions and design solutions <br />addressing the stabilization of the soils and, sediment control will be adhered to. <br /> <br />. The project formalizes the protection of the bluff area in perpetuity for the <br />future generations through scenic easements and, homeowners association <br />documents. <br /> <br />Sincerely, <br /> <br />Daniel Tùsen <br /> <br />Cc: Dave Osberg <br />Cc: Tom Montgomery <br />