Laserfiche WebLink
<br />Public Works Department <br /> <br />Streets & Utilities <br />480-6185 <br /> <br />Engineering <br />480-2334 <br /> <br />PROPOSED 2003 STREET AND UTILITY CONSTRUCTION <br /> <br />General Sieben Drive <br />Construction will begin soon on the <br />extension of General Sieben Drive <br />south from 15th Street to connect to <br />Country Road #46. The construction <br />will include sidewalk and a <br />bituminous trail, a bridge crossing <br />over the Vermillion River, and the <br />construction of a trunk watermain and <br />a sanitary sewer lift station. <br /> <br />The construction schedule calls for <br />the road extension to be completed <br />by the end of the year. The connection <br />of General Sieben Drive to Country <br />Road #46 will provide a needed north! <br />south collector street at the west end <br />of the City and help relieve the volume <br />of traffic on Pleasant Drive. <br /> <br />The widening and reconstruction of <br />General Sieben Drive between the <br />South Frontage Road and 4'" Street, <br />adjacent to Cub Foods, Target, Wal- <br />Mart and the Dakota County <br />Government Center, will be completed <br />later this spring. Remaining work <br />includes placing the final lift of <br />bituminous paving, lane striping, <br />replacing the temporary traffic signals <br />at Highway 55 with new permanent <br />signals, sidewalk and trail <br /> <br />construction, and landscaping. <br /> <br />- <br /> <br /> <br />.~. <br /> <br /> <br />urtst.tlon <br /> <br />.. ';1_ <br /> <br />Project 2003-20 <br />General Sieben Dr. Extension <br /> <br />Riverwood!South Oaks <br />On the south end of town, design work is <br />progressing for the construction of new <br />collector streets that will link new <br />developments and provide access to both <br />Highway 61 and Country Road #46. The new <br />collector roads will include an extension of <br />36'" Street west to connect to Village Trail <br />and Riverwood Drive within the Riverwood <br />development; an extension of 31 51 Street west <br />to connect to County Road #46; an extension <br />of Century Drive north to connect to 31" <br />Street; and an extension of Bohlken Drive <br />west and south to connect to 3151 Street. <br /> <br />Construction of 31" Street and 36'h Street will <br />include three large box culvert installations, <br />crossing over the large drainage ways <br />between the Riverwood, Century South and <br />South Oaks developments. Sidewalk and <br />bituminous trails will also be constructed <br />along 31" and 36'h Streets along with <br />interconnecting trails through the Century <br />South and South Oaks Addition to the <br />existing trail aiong the Vermillion River. <br /> <br />Other Construction Projects <br />Construction of a Hwy 61 underpass for the <br />Vermillion River Trail is planned for later this <br />year. The City received approximately <br />$300,000 in grants to help fund this <br />construction. The existing trail will be <br /> <br />extended towards the Vermillion River at <br />its intersection with Cannon Street behind <br />Applebee's Restaurant, and run along the <br />Vermillion River bank and beneath the <br />Highway 61 bridge to connect to the <br />existing trail system in the Vermillion Falls <br />Park. The work will include lighting, storm <br />sewer relocation and retaining wall <br />construction. <br /> <br />In cooperation with MnDOT, the southeast <br />corner of the 10th Street and Highway 61 <br />intersection will be reconstructed to add <br />a right turn lane and broaden the corner <br />to all trucks to make an easier turn from <br />northbound Highway 61 to eastbound 10th <br />Street. The traffic signal located at this <br />corner that is frequently struck by turning <br />trucks will also be relocated. Start of <br />construction is waiting on an easement <br />from Walgreens needed to relocate the <br />sidewalk at this corner. <br /> <br />New Developments <br />Construction has started on the street and <br />utility improvements for the Wallin 1 Dlh <br />Addition on the west end of town. These <br />improvements will include connecting <br />both Northridge Drive and River Shore <br />Drive to the new General Sieben Drive <br />extension. On the south end of town, the <br />South Pines 6'h Addition on the west side <br />of Highway 316 will extend existing streets <br />south to connect to Michael Avenue. <br /> <br /> <br />Riverwod 7th Addition <br /> <br />+ <br /> <br />Pl'"oposed 2003 Constl'"uction <br />31st St., 36th St., <br />Riverwood 7th Addition <br />South Oaks Addition <br /> <br />.- <br />CITY OF HIISTI~&S <br /> <br />300 0 300 &00 F..~' <br /> <br />. <br />