Laserfiche WebLink
<br />South Oaks of Hastings 3'" Addition - Final Plat <br />City Council Memo - February 22, 2005 <br />Page 3 <br /> <br />1) Cash in lieu of land shall be paid to satisfy Park Dedication requirements in <br />the amount of $29,700 (27 units x $1100 per unit) prior to the release ofthe <br />Final Plat mylars for recording. <br /> <br />Interceptor Sewer Fee <br />The following must be paid to satisfy sewer interceptor fees: <br /> <br />1) Sewer Interceptor fees in the amount of $9,045 (27 units x $335 per unit) shall <br />be paid prior to the release of the Final Plat mylars for recording. <br /> <br />Landscape Plan <br />The landscape plan identifies boulevard tree plantings every 50 lineal feet along right-of- <br />ways, planted at 2.0 caliper inches. The following additions are needed to comply with <br />minimum requirements: <br /> <br />1) One front yard tree is required to be planted within 15' of the right-of-way line. <br /> <br />2) Boulevard trees must be setback at least 30 feet from all intersections. Some <br />trees on the existing plan appear to encroach within the 30 foot area. <br /> <br />Erosion Control Problems <br />The City has experienced problems with the builder\developer of South Oaks 151 Addition in <br />maintaining silt fences, and clear access of streets during construction. Erosion control <br />measures must be improved for the existing development, and will be closely monitored <br />during the construction of South Oaks 3rd Addition. <br /> <br />Ownership Status <br />The town home units will be available for sale. <br /> <br />Site Plan Review <br />Site Plan review and approval for all buildings exceeding two units must be granted by the <br />City Council, prior to construction. <br /> <br />ATTACHMENTS <br /> <br />. Location Map <br />. Final Plat <br />. Application <br />