Laserfiche WebLink
<br />NOTES <br /> <br />THE CONTRACTOR SHALL NOT USE <br />PROPOSED PARKING LOT ENTRANCE AS <br />HAUL ROAD <br /> <br />HAUL ROAD LOCATION SHALL BE <br />APPROVED BY THE ENGINEER PRIOR TO <br />USE <br /> <br />THE CONTRACTOR SHALL BE REQUIRED <br />TO EXCAVATE UNSUITABLE MATERIAL <br />FROM THE SUBGRADE WITH A BACKHOE <br /> <br />EXCAVATE EXISTING SOIL TO A DEPTH <br />OF 36" TO 48" BELOW PROPOSED <br />CLASS 5, SEE PROPOSED PROFILE IN <br />EXHIBIT B <br /> <br />SOIL CORRECTION AREA SHALL EXTEND <br />3' BEYOND PROPOSED BITUMINOUS <br />SURFACES AND CONTINUE TO THE <br />BOTTOM AT A 1.5: 1 <br /> <br />THE CITY WILL PROVIDE TRUCKS FOR <br />HAULING OF UNSUITABLE MATERIAL <br />OFF -SITE AND SAND/RECYCLED <br />MA TERIAL ON-SITE. THE TRUCKS WILL <br />BE AVAILABLE FOR A MINIMUM OF 10 <br />HRS PER DAY BEGINNING AT 7: 00 AM <br /> <br />ANY CLAIMS FOR DOWNTIME SHALL BE <br />INCLUDED IN UNIT COSTS UNDER THIS <br />CHANGE ORDER. <br /> <br /> <br /> <br />\ <br />"- <br />\ <br />\ <br />( <br />" <br /> <br />(}--- <br /> <br />IRON P1Pt <br />* <br />\1'O"q.).:.. <br />r..........<.J~.!'( <br /> <br />QllAINACE <br />IC[nrAY <br /> <br />\ <br />'- <br /> <br />/ <br />/ <br />/ <br />\ <br />/ <br />/ <br />'-.. <br /> <br /> <br />- <br /> <br />ST. <br /> <br />-otL----ot.-----ot.. ~ <br /> <br />LE DUC HISTORIC SITE <br />IMPROVEMENTS <br /> <br />EXHIBIT <br /> <br />~ <br /> <br />BDM <br />CONSULTING ENGINEERS, PLC CI TY PROJECT 2005- 4 <br /> <br />A <br /> <br />o 50 <br />