My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-16-05
10.0.0.9
>
City Council
>
CC Packets
>
2000's
>
2005
>
05-16-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2009 8:24:12 AM
Creation date
6/29/2005 4:10:00 PM
Metadata
Fields
Template:
City Council
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />to five feet below the top of the proposed parking lot. <br />To relieve the perched water table the Contractor will complete placement of 24 to 36 inches <br />of a select granular material (sand) and +/-12 inches of recycled aggregate material from the <br />City stockpile directly below the proposed parking lot and access road sections. A keyway <br />constructed below the proposed section at the driveway/parking lot interface will provide soil <br />drainage away from the affected area. <br />The Contractor shall bear all costs associated with excavation and loading the unsuitable <br />material; The City will bear all costs of providing trucks personnel and equipment to haul the <br />unsuitable material from the site. Upon being placed in the City supplied trucks the material <br />shall become the property of the City. The Contractor shall bear all costs to maintain the site <br />and to excavate and load the unsuitable material, for which he shall be reimbursed at the unit <br />cost shown above. <br />The Contractor shall bear all costs associated with supplying and loading the Select Granular <br />Borrow at their Hastings pit, and all costs for spreading and compaction of the Select <br />Granular Borrow on site as described by this Change Order for which he shall be reimbursed <br />at the unit cost shown above. The City shall deliver the Select Granular Borrow to the site at <br />no cost to the Contractor. <br />The City shall supply and deliver the Recycled Aggregate Material to the site at no cost to <br />the Contractor. The Contractor shall bear all costs to spread place and compact the material <br />on the site for which he shall be reimbursed at the unit cost shown above. <br /> <br />The amount of the Contract will be (Increased) By the Sum Of: Fortv-Seven Thousand and Six <br />Hundred and Eightv-Five and 00/100 Dollars ($47.685.00). <br /> <br />The Contract Total including this and previous Change Orders Will Be: One-Hundred and Fortv- <br />Five Thousand. Eight-Hundred and Eightv-One and 45/100 Dollars ($145.881.45). <br />The Contract Period Provided for Completion Will Be (increased): -24- Days. <br />This document will become a supplement to the contract and all provisions will apply hereto. <br /> <br />Accepted <br /> <br />Contractor's Authorized Representative <br /> <br />(Date) <br /> <br />Approved <br /> <br />Acting City Engineer <br /> <br />(Date) <br /> <br />Attachments: <br /> <br />Exhibit A showing the plan view of construction. <br />Exhibit B showing the proposed cross section and profile of area <br /> <br />Change Order No. 1 <br />City Project 2005-4 <br />Page 2 of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.