My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-16-05
10.0.0.9
>
City Council
>
CC Packets
>
2000's
>
2005
>
05-16-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2009 8:24:12 AM
Creation date
6/29/2005 4:10:00 PM
Metadata
Fields
Template:
City Council
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Hastings <br /> <br />Le Due Historic Site Improvements <br /> <br />CHANGE ORDER # 1 <br /> <br />Contractor: Midwest Asphalt Corporation <br /> <br />City Project: 2005-4 <br /> <br />Address: PO Box 5477 <br />Hopkins, MN 55343 <br /> <br />Location: Hastings, Minnesota <br /> <br />In accordance with the tenns of this Contract, you are hereby authorized and instructed to perfonn the Work as altered by the <br />.(ijowinl7 nrovisions <br /> <br />Description of Changes <br />Supplemental Plans and Specifications Attached <br /> <br />MnDOT Added Items Unit Unit Price Estimated Total <br />Number Amount <br />2105.501 Excavation of Unsuitable Material CY $7.60 3350 $ 19,250.0C <br />2105.521 Recycled Aggregate Material From City Stockpile CY $3.50 850 $ 2975.0C <br />2105.522 Select Granular Borrow Mod. 10% CY $7.70 2500 $25,460.0C <br /> NET CHANGE IN CONTRACT $47,685.00 <br /> <br />MnDOT Deleted Items Unit Unit Price Estimated Total <br />Number Amount <br /> <br />NET CHANGE IN CONTRACT <br /> <br />$ 47.685.00 <br /> <br />JUSTIFICATION: <br /> <br />During the excavation operations for the parking lot it was found that the subgrade soil <br />conditions were not adequate to sustain the load proposed by the plans. These deleterious <br />soils were not only saturated but a perched water table created a wet surface condition. <br />Braun Intertec performed an analysis of the soil conditions. They came to the conclusion that <br />the unsuitable material should be removed down to an existing sand layer approximately four <br />Change Order No. 1 <br />City Project 2005-4 <br />Page lof2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.