Laserfiche WebLink
<br />the need to preserve the route and obligation for construction during future development. <br />To further memorialize future roadway obligations, the following condition should be added: <br /> <br />1) A covenant shall be recorded against all land contained within the future north\south <br />collector road located just west of the subject property. The covenant shall give <br />notice of the obligation to construct the collector roadway to City Standards at the <br />full cost of the owner prior to any subdivision approval. <br /> <br />Outlots <br />Four outlots are planned for future development. The outlots would be held in common by <br />residents of the development for open space and access purposes. <br /> <br />Association Documents and Covenants <br />Association documents and covenants will need to be recorded with the Final Plat to <br />ensure maintenance of all common items including open space and common drives. <br /> <br />Grading, Drainage, Erosion Control, and Utility Plan <br />The City's consultant engineer has approved the Grading, Drainage, Erosion Control, and <br />Utility Plans. <br /> <br />Off Site Pondin9 Basin <br />A stormwater ponding basin is proposed west of the plat in NiningerTownship. Approval is <br />subject to the following: <br /> <br />1) The homeowner association shall be responsible for the maintenance of the off-site <br />stormwater basin. <br /> <br />2) The applicant shall obtain any approvals necessary by Nininger Township in order <br />to construct the off-site stormwater basin. <br /> <br />Park Land Dedication <br />The Natural Resource and Recreation Commission will meet on May 10,2005 to determine <br />park dedication. The NRRC is likely to recommend cash in lieu of land as follows: <br /> <br />1) Cash in lieu of land shall be paid to satisfy park dedication requirements in the <br />amount of $125,400 (114 units x $1,100 per unit). Park dedication must be paid <br />prior to recording of the Final Plat. <br /> <br />Interceptor Sewer Fee <br />Sewer interceptor fees shall be paid as follows: <br /> <br />1) Sewer interceptor fees in the amountof$41 ,610 (114 units x $365 per unit) shall be <br />paid prior to recording of the Final Plat. <br /> <br />Parking <br />