Laserfiche WebLink
<br />Public Improvement Plans dated , a copy of which is on file at City Hall. <br />The City will provide design and material specifications. The cost of constructing the <br />esplanade and lighting shall be reimbursed to Developer by the HRA upon <br />completion of construction and acceptance by the City of Hastings Public Works <br />Department. The City will be responsible for maintaining the esplanade and lighting <br />after they have been constructed. <br /> <br />At the time the final plat is signed by City, Developer shall convey to City, at no cost, <br />a permanent easement for public access drainage and utility purposes over the <br />esplanade as shown on the final plat of the Subject Property. <br /> <br />9. Parkin/!. At the time Phase I is constructed, Developer shall also construct the <br />parking as shown on. attached Exhibit A. All parking spaces along the east side of <br />Lot 1 shall be constructed with concrete curb and gutter. All parking spaces on Lots <br />1 and 2 shall be covered with a bituminous surface as approved by the City. HRA <br />agrees to give Developer a temporary easement over Lot 1 and Lot 3 for the purposes <br />of constructing and maintaining the parking areas on both lots. <br /> <br />It is agreed that part of Lot 3 will be graded by Developer and used as a temporary <br />parking lot until Phase 2 is built. Until construction on Phase 2 commences, <br />Developer shall keep the graded portions of Lot 3 covered with Class 5 gravel or <br />asphalt. Developer shall be required to maintain the temporary parking area on Lot <br />3, and make it available for public parking as shown on the parking plan attached as <br />Exhibit A, until such time that construction begins on Phase 2. The HRA will <br />maintain that part of Lot 3 that is undisturbed by Developer until Lot 3 is sold. <br /> <br />10. TraiL Developer agrees to construct a bituminous pedestrian trail along the eastern <br />edge of Lot 1 trom the north side of Second Street north to a point on Lot 1 to be <br />determined by the City. This trail shall be at least 10 feet wide and otherwise <br />constructed to City specifications. The HRA will reimburse Developer for the costs <br />to construct the trail upon completion of the trail and acceptance by the City's Public <br />Works Division. This trail will be maintained by the City. At the time the HRA <br />conveys Lot 1 to Developer, Developer shall convey to City a permanent trail, <br />drainage and utility easement at no cost to City. <br /> <br />11. Gradin/!. Developer shall grade the Subject Property according to the grading and <br />erosion control plan dated March 31, 2005, a copy of which is on file at Hastings City <br />Hall. Any area graded on Lot 1 shall be seeded with grass and maintained by <br />Developer until the earlier of June 30, 2007 or when development of Phase 3 is <br />commenced. <br /> <br />Other than as provided for Lot 2 and Lot 3, all disturbed areas on the Subject <br />Property must be stabilized with a rooting vegetative cover to eliminate any erosion <br />