My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-20-01
10.0.0.9
>
City Council
>
CC Packets
>
2000's
>
2001
>
02-20-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2013 2:38:16 PM
Creation date
10/6/2006 3:25:25 PM
Metadata
Fields
Template:
City Council
City Council - Type
CC Packets
Date
10/6/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Riverfront Improvements <br /> <br />Project 2000-20 <br />Lock and Dam Access Road and Trail Improvements <br /> <br />Assessment Analvsis: <br /> <br />1. ) <br /> <br />STREET ASSESSMENT <br />Estimated Street Construction <br />Plus Contingencies (10%) <br />Subtotal, Construction Costs <br />Plus Engineering, Legal, Admin and Bonding <br />Plus Assessment Roll Prep and Cap Interest (9%) <br />Less Corps of Engineers Participation <br />Less City Participation (center 24') <br /> <br />Total Estimated Assessable Project Costs <br />Assessable Frontage <br />Estimated Assessment Per Front Foot <br /> <br />2.) <br /> <br />STORM SEWER ASSESSMENT <br />Estimated Storm Sewer Construction <br />Plus Contingencies (10%) <br />Subtotal, Construction Costs <br />Plus Engineering, Legal, Admin and Bonding (11%) <br />Plus Assessment Roll Prep and Cap Interest (9%) <br />Less Corps of Engineers Participation <br /> <br />Total Estimated Assessable Project Costs <br />Assessable Frontage <br />Estimated Assessment Per Front Foot <br /> <br />3.) <br /> <br />SANITARY SEWER ASSESSMENT <br />Estimated Sanitary Sewer Construction <br />Plus Contingencies (10%) <br />Subtotal, Construction Costs <br />Plus Engineering, Legal, Admin and Bonding (11 %) <br />Plus Assessment Roll Prep and Cap Interest (9%) <br /> <br />Total Estimated Assessable Project Costs <br /> <br />D:\tom\Spreadsheets\l&d2accessroad Est. QPW <br /> <br />$641,850.00 <br />$64.185.00 <br />$706,035.00 <br />$136,660.30 <br />$47,394.05 <br />$316,094.71 <br />$452.808.00 <br /> <br />$121,186.64 <br />10,300 ft <br />$11.77 per FF <br /> <br />$100,950.00 <br />.$10.095.00 <br />$111,045.00 <br />$21,493.90 <br />$7,454.12 <br />$49,715.29 <br /> <br />$90,277.73 <br />10,000 ft <br />$9.03 per FF <br /> <br />$34,960.00 <br />$3.496.00 <br />$38,456.00 <br />$7,443.55 <br />$4.130.96 <br /> <br />$50,030.51 <br /> <br />02/12/01 TMM <br />
The URL can be used to link to this page
Your browser does not support the video tag.