Laserfiche WebLink
PROPOSED 101h <br /> STREET RECONSTRUCTION <br /> INFORMATION SHEET <br /> February 17, 2000 <br /> Reconstruction Area: Typical Assessments: <br /> Tenth St-From Vermillion St. to We have completed enough of the design <br /> Ashland Street. process to properly estimate the <br /> assessments for these improvements. <br /> Street Widths: Based on the preliminary design we <br /> Existing streets will be widened to meet project assessment for a 70'wide lot as <br /> city standards. Street width will be 36 ft. follows: <br /> wide to accommodate on-street parking Street at$47.34/FF: $3,314 <br /> needs on both sides of the street. All Storm at $30.92/FF: $2,164 <br /> streets will be constructed with concrete Total Assessment: $5,478 <br /> curb with gutter. <br /> Why This Street? <br /> Sidewalks: This street is a substandard City street, in <br /> A.5'-8' sidewalk will be constructed on the poor shape and lacking curb and gutter for <br /> south side . Special provisions will be proper drainage. In order to address these <br /> made to preserve the existing stone problems and to coordinate improvements <br /> walls on both sides of the street. to Todd Field, the City proposes this <br /> project. <br /> Storm Sewer: Assessment Abatement: <br /> Install storm sewer to correct drainage The City has applied for Federal <br /> problems. Storm sewer will be extended Community Block Grant(CDBG) funds <br /> from 10`h St&Ashland to 10`' & for assessment abatement. Qualifying low <br /> Eddy St. income households would have their entire <br /> assessment funded by these CDBG funds. <br /> Proposed Project Schedule Any funds remaining after meeting low <br /> March 20" Council holds public income households assessment needs will <br /> be divided evenly among qualifying <br /> hearing to determine if moderate income households. <br /> project should be built. <br /> May 2000 Begin construction Comments: <br /> Oct 2000 Complete construction We need your comments and any <br /> Fall 2001 Assessment Hearing additional information you feel would be <br /> helpful in preparing the design. This will <br /> Assessment Information• help assure the most accurate design and <br /> Assessments are spread over a 10 year cost-estimating. <br /> period and are collected by Dakota <br /> County with your property tax. If the <br /> Council proceeds with construction of this <br /> project, the first assessment payment <br /> would be due with your 2001 property tax <br /> payment. <br /> M AFEASBLTY\2000\meetinfo3.wpd <br />