Laserfiche WebLink
<br />Mr. David Osberg <br />City of Hastings <br />Supplemental Agreement No.3 for Architectural and Engineering Services <br />Final Design, Bidding, and Construction Phase Services <br />City Hall 1st Floor Renovation and Public Works Administration Renovation/Expansion <br />September 25, 2007 <br />Page 2 <br /> <br />This Supplemental Agreement No.3 is for Bidding and Construction Phase Services for three of the <br />Project parts and Final Design of the Emergency Generator Project part. This Supplemental Agreement <br />No.3, made and entered into as ofthe date formalized at the end of this Agreement, amends the original <br />Agreement dated August 4,2006, as modified by Supplemental Agreement No. I dated March 21, 2007, <br />and Supplemental Agreement No.2 dated July 16, 2007, for the Project as hereinafter stated. <br /> <br />I. Add the following new Tasks to SECTION II - SERVICES TO BE PROVIDED BY TKDA: <br /> <br />"M. FINAL DESIGN - EMERGENCY GENERATOR FOR POLICE AND CITY HALL <br /> <br />l. Meet with the OWNER to review preliminary design materials for the emergency <br />power requirements and opinion of probable costs. <br /> <br />2. Prepare final design drawings and specifications. <br /> <br />3. Meet with the OWNER to review final construction documents and make minor <br />revisions based on review comments. <br /> <br />4. Reproduce three sets of signed documents and deliver to the OWNER for their <br />use in soliciting bids. <br /> <br />N. BIDDING PHASE - PUBLIC WORKS AND CITY HALL <br /> <br />I. Consult with and advise the OWNER and act as the OWNER'S Representative <br />as provided in the Contract Documents. <br /> <br />2. Distribute all bid documents from TKDA'S St. Paul office. <br /> <br />3. Submit documents for code review, MCES for WAC/SAC review and <br />Department of Labor and Industry for plumbing review (Department of Health). <br /> <br />4. Respond to review comments and revise drawings as required. <br /> <br />5. <br /> <br />.... <br />.:>. <br /> <br />Attend and assist the OWNER with conducting a pre-bid conference with <br />prospective bidders and assist the OWNER in evaluation of bids received. <br /> <br />6. Provide clarification and issue any addenda during the bidding period. <br /> <br />7. Prepare bid tabulation sheet and attend bid opening at City Hall. <br /> <br />8. Evaluate bids and provide a written recommendation regarding award of bid. <br /> <br />CONSTRUCTION PHASE - PUBLIC WORKS AND CITY HALL <br /> <br />I. Prepare AlA contracts for construction. <br /> <br />2. Attend and assist the OWNER with a pre-construction conference to be attended <br />by the contractor, the OWNER, and others as may be requested by the OWNER. <br /> <br />Attend progress meetings during construction with the OWNER and the <br />contractor. Eight meetings are anticipated for the Public Works Expansion <br />Project part. Two meetings each are anticipated for the other two Project parts. <br /> <br />Make visits to the site at intervals appropriate to the various stages of <br />construction to observe the progress and quality of the executed work of the <br />contractor and to determine, in general, if such work is proceeding in accordance <br /> <br />O. <br /> <br />4. <br />