My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-04-05
10.0.0.9
>
City Council
>
CC Packets
>
2000's
>
2005
>
04-04-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2009 8:23:56 AM
Creation date
4/21/2005 3:29:49 PM
Metadata
Fields
Template:
City Council
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Top of Block Inspection <br /> <br />v ~ ":I <br /> <br />The City shall require a top of block inspection. The top of block inspection fee is $75 and will <br />be charged with the issuance of the construction permit. <br /> <br />A top of block inspection shall be performed to verify garage slab elevation, top of block <br />elevation, and lowest rront and rear opening elevations. This inspection shall be performed prior <br />to the building being back filled. <br /> <br />Top of Block Inspection Process <br /> <br />. At the time a builder schedules a foundation inspection, the Building Department will inform <br />the consulting firm used for surveying inspections that a top of block inspection needs to be <br />done. <br />. The City's consulting firm will conduct the top of block inspection within 2 business days of <br />being notified by the Building Department. <br />. Tolerances for top of block inspections are as follows: <br />o 0.2 feet low <br />o 0.5 feet high <br /> <br />. The City's consulting firm will tag the site with either a pass or fail sticker. <br />. If the site passes inspection, work may continue on the project. <br /> <br />Top of block failed inspection process <br /> <br />. The City's consulting firm will tag site with a fail sticker and notify the Building Department <br />of the failure and include the reasons for the failure. <br />. Builder must take corrective action and call for are-inspection <br />. Any variations outside these tolerances will require corrective action by the Builder and may <br />require the original subdivision engineer to revise the development grading plan to correct <br />drainage issues. <br />. A new Certificate of Survey and Building Plans may have to be submitted <br /> <br />Re-inspection Fee <br /> <br />. The fee to re-inspect a property is $75.00. This fee must be paid prior to any further <br />inspections by the Building Department. <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.