Laserfiche WebLink
<br />special hardened anchors would be used to hold the new hood on to the <br />building. The rest of the hoods and bows would only need repair, and would <br />not need to be re-poured. <br /> <br />Grossman asked if more material that was originally used for the bows and <br />hoods would be used and ifthe material would be the same color. Erickson <br />specified that the same amount of material that was there originally would be <br />used. Erickson said that they can dye the material to a grey color to match the <br />original. Martin moved and Hicks seconded to approve bow and hood repair, <br />with one hood that will be re-poured. The material will be the same grey color <br />and the finished surfaces will be defined. Motion passed unanimously. <br /> <br />Approval of the above item is in accordance with Residential Guideline #4: <br />windows. <br /> <br />Next the Commission discussed pouring new concrete steps on the north side of <br />the building and jacking up a potion of the wall back to the original position. <br />Grossman pointed out that this was repair work and that the existing concrete <br />stairs on the north side of the building did not have original material. St. James <br />motioned and Behnke seconded to approve pouring new concrete steps and <br />jacking up the building on the north side. <br /> <br />Approval of the above item is in accordance with Residential Guideline #7: <br />porches and steps. <br /> <br />Finally the Commission discussed taking out the walls on the entry porch to the <br />Carriage House while keeping the roof and putting in pipe-type pillars. <br />Erickson presented information regarding the pipe-type pillars and possible <br />decorative rod iron. Grossman pointed out that they did not have a design for <br />the Commission to see and they should bring one back at the next meeting. St. <br />J ames said that the porch on the Carriage House should be of the era the <br />Carriage House was built. Commissioners decided to defer this item for the <br />time being. <br /> <br />Approval of the above item is in accordance with Residential Guideline #7 <br />porches and steps and #10 garages and accessory structures. <br /> <br />Tronnier informed the Commission of other work that they want to do in the <br />future including changing the colors of the shingles, putting up a flag pole, <br />putting up a sign, and cascading the front sidewalk to make it safer. <br /> <br />C. 110 East 4th Street. Black River Properties, LLP. Restoring the brick to the <br />original condition. Windows and rotten trim will be replaced and painted. <br />Grossman presented information and itemized the work that will be done: <br />1. Taking off the exiting paint, tuck pointing, and repairing the mortar. <br />2. Scrape, paint, and repair trim work. <br />