Laserfiche WebLink
Estimated Typical Assessments <br /> We have completed enough of the design process to properly estimate the assessments for these <br /> improvements.Based on the preliminary design we project assessments for a 70'wide lot as follows: <br /> 9t' Street <br /> Street at$55.60/FF: $3,892 <br /> Storm at$40.35/FF: $2,825 <br /> Total Assessment: $6,717 <br /> 10th Street <br /> Street at$51.85/FF: $3,630 <br /> Storm at$00.00/FF: $0 <br /> Total Assessment: $3,630 <br /> 11`t' Street <br /> Street at $67.60/FF: $4,732 <br /> Storm at $45.71/FF: $3,200 <br /> Total Assessment: $7,932 <br /> Forest Street <br /> Street at$37.33/FF: $2,613 <br /> Storm at$00.00/FF: $0 <br /> Total Assessment: $2,613 <br /> Costs for replacing utility services that were found to be defective or of improper construction <br /> materials will be paid for on a 50% split by the City. These services will only be replaced on a <br /> as-needed basis and only to the property line. <br />