My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-06-00
10.0.0.9
>
City Council
>
CC Packets
>
2000's
>
2000
>
03-06-00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2021 3:14:15 PM
Creation date
10/8/2007 10:35:23 AM
Metadata
Fields
Template:
City Council
City Council - Type
CC Packets
Date
3/6/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimated Typical Assessments <br /> We have completed enough of the design process to properly estimate the assessments for these <br /> improvements.Based on the preliminary design we project assessments for a 70'wide lot as follows: <br /> 9t' Street <br /> Street at$55.60/FF: $3,892 <br /> Storm at$40.35/FF: $2,825 <br /> Total Assessment: $6,717 <br /> 10th Street <br /> Street at$51.85/FF: $3,630 <br /> Storm at$00.00/FF: $0 <br /> Total Assessment: $3,630 <br /> 11`t' Street <br /> Street at $67.60/FF: $4,732 <br /> Storm at $45.71/FF: $3,200 <br /> Total Assessment: $7,932 <br /> Forest Street <br /> Street at$37.33/FF: $2,613 <br /> Storm at$00.00/FF: $0 <br /> Total Assessment: $2,613 <br /> Costs for replacing utility services that were found to be defective or of improper construction <br /> materials will be paid for on a 50% split by the City. These services will only be replaced on a <br /> as-needed basis and only to the property line. <br />
The URL can be used to link to this page
Your browser does not support the video tag.